Permit Information
Permit NumberBLD16-00204
StatusFinaled
Name SCOTT CANNING
Site Address 801 S CAPITOL BLVD
Project NameThe Log Cabin Literary Center
Customer NumberMIS16-00204
ePlanReviewNo
Description
**(THE LOG CABIN LITERARY CENTER)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a historic existing building. (950 sq ft office space on the second floor BLD07-02308, 2,184 q ft on the main leve BLD96-02427 and 2,000 sq ft on the basement level BLD00-02729. All three permits made it to the final stage of the projects however no final inspections were called in. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There is no change of use or occupancy. AJS**
BLD96-02427-To remodel 3 separate areas of the existing facility which include remodel of the men's restroom in the basement to provide accessibility for the disabled; repair and remodel the front entry stairway and landing; and replace the rear landing and stair from the basement area all per approved plans on file. This is considered to be Phase 1 of a project which will include further phases under separate permits. (P.C.#504-96)RMH
BLD00-02729-**LOG CABIN LITERARY CENTER** THIS BUILDING IS AN HISTORICAL BUILDING. This permit is for construction of an accessible ramp to the basement area, the remodel of two restrooms in the basement area to make fully accessible, the installation of a wheelchair lift at the front entrance to the first floor for convinece (this level is not required to be accessible), the installation of a sprinkler system in the basement, the installation of a new HVAC system throughout, the construction of a one-hour wall and installation of a 20minute fire rated door which will separate the basement area from the first floor, construction of a trash enclosre. Separate permits required for Mechanical, electrical, plumbing and fire sprinklers required. The fire sprinkler system shall be installed per NFPA #13 as regulated by the fire department. (P.C.#737-00)*RMH* PLAN MODIFICATION 5/12/03 : INSTALLATION OF NEW ELEVATOR IN LIEU OF PLATFORM LIFT, CHANGING HVAC, CHANGING LOCATION OF RESTROOMS, ADDING BREAKROOM AREA, ALTERING THE BASEMENT AREAS & STAIRWAY CONFIGURATION (RMH / 5/12/03)
BLD07-02308-*(The Cabin Literary Center)* To structurally upgrade the floor of the 950 sq ft second story for future office space use, per approved plans and attached engineering. Work to include, remove and replace floor sheathing, upgrade existing floor joists, and roof trusses all per attached engineering, This floor space is existing with elevator and stairway access, This building is fully fire sprinklered any alterations to the sprinkler system will require a separate permit and shall be installed and maintained per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20163/18/20163/18/2016APASS
DetailsDave Hannah
Please call 30min prior for access - Keith Phone #: ###-####
FIRE-Final Inspection3/16/20163/17/20163/17/2016APASS
DetailsJim Page
All previously noted items repaired, final life fire safety inspection passed/complete
FIRE-Final Inspection3/1/20163/1/20163/1/2016PPART
DetailsJim Page
Fire sprinkler has current inspection tag, fire extinguishers have current inspection tags. Exit lights have been repaired and are now functional. Emergency egress lighting has been repaired and are now functional. Final item for repair is the smoke detector missing located in the basement and inspection of smoke curtian operation on each floor for the elevator.
BLD-Final2/24/20162/25/20162/25/2016ACANC
DetailsDave Hannah
Keith// please call 30 min. prior Phone #: ###-####
FIRE-Final Inspection2/24/20162/24/20162/24/2016PFAIL
DetailsJim Page
Exit lights did not stay illumunated when test button was pressed, all exit lights need serviced/replaced. Emergency egress lights would not illuminate when test buttons were pressed, all egress lights need to be serviced/replaced. Smoke detector missing in front of elevator at the basement level, smoke detector needs to be installed and verified for operation for smoke curtian activation. Smoke detectors on 1st floor as well as attic level need to be tested for operation with smoke curtian activation.