BLD-Final | 10/6/2016 | 10/10/2016 | 10/10/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok for perm occ
|
BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | NR |
Dave Hannah
|
|
|
Bob Phone #: ###-#### needs stairway signage
|
BLD-Final | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags, level 1 tenant space area is unoccupied space at time of inspection so no fire extinguishers or exit signs, fire sprinkler system is active. Final life fire safety inspection passed/complete.
|
BLD-Conference | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | CANC |
Mike Jordan
|
|
|
Insulation Bob Phone #: ###-####. Per contractor, inspector #425 has already inspected and inspection request was made in error.
|
BLD-Energy code compliance | 7/27/2016 | 7/27/2016 | 7/27/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Energy code compliance | 7/25/2016 | 7/26/2016 | 7/27/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### first floor ok to insulate
|
BLD-Energy code compliance | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-####second floor ok to cover
|
BLD-Framing/Rough-in | 7/14/2016 | 7/14/2016 | 7/14/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to insulate second floor
|
BLD-Energy code compliance | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | CANC |
Dave Hannah
|
|
|
Insulation // Bob Phone #: ###-#### ok to cover 3rd floor
|
BLD-Framing/Rough-in | 7/8/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####-floor 3
|
BLD-Energy code compliance | 7/5/2016 | 7/6/2016 | 7/6/2016 | A | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover 4th floor
|
BLD-Energy code compliance | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### 4th floor walls ok to insulate
|
BLD-Energy code compliance | 6/30/2016 | 7/1/2016 | 7/1/2016 | A | PART |
Dave Hannah
|
|
|
Insulation // Bob Phone #: ###-#### ceiling first floor ok to lid
|
BLD-Framing/Rough-in | 6/29/2016 | 6/29/2016 | 7/1/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### first floor ok
|
BLD-Energy code compliance | 6/20/2016 | 6/21/2016 | 6/21/2016 | A | PART |
Dave Hannah
|
|
|
4th floor // Bob Phone #: ###-#### ok to prerock
|
BLD-Framing/Rough-in | 6/17/2016 | 6/17/2016 | 6/20/2016 | P | PART |
Dave Hannah
|
|
|
Bob-partial frame on 4th floor Phone #: ###-#### 4th floor ok to insulate
|
BLD-Energy code compliance | 6/13/2016 | 6/14/2016 | 6/16/2016 | A | PART |
Dave Hannah
|
|
|
Part Insulation // Bob Phone #: ###-#### second floor comon areas ok to cover
|
BLD-Framing/Rough-in | 6/14/2016 | 6/14/2016 | 6/16/2016 | P | PART |
Dave Hannah
|
|
|
3rd Floor; Bob Phone #: ###-#### hallways and comon areas bath rooms ok to insulate
|
BLD-Energy code compliance | 6/15/2016 | 6/16/2016 | 6/16/2016 | A | PART |
Dave Hannah
|
|
|
Bob-partial on 3rd floor insulation for sheet rock Phone #: ###-#### ceilings on 3rd floor hallways and comon areas ok to rock
|
BLD-Energy code compliance | 6/10/2016 | 6/13/2016 | 6/13/2016 | P | NR |
Dave Hannah
|
|
|
Part Insulation // Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 6/8/2016 | 6/9/2016 | 6/10/2016 | P | PART |
Dave Hannah
|
|
|
Part // Bob Phone #: ###-#### ok to start insulating 2nd floor
|
BLD-Wall Bracing | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 5/27/2016 | 5/31/2016 | 5/31/2016 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Wall Bracing | 5/26/2016 | 5/26/2016 | 5/26/2016 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover 1st floor ext walls
|
BLD-Conference | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | DONE |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|