BLD-Final | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Tony Young
|
|
|
Pete Phone #: ###-####,, all ok now
|
BLD-Final | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, pod 1 and 2 ok for temp occupancy
|
FIRE-Final Inspection | 7/12/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags and knox box is in place by fire riser room, building fire safety and evacuation plan documents will be placed in units when construction is complete. Final life fire safety inspection passed/complete.
|
BLD-Conference | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, pod 1 and 2 walk through,, door lables,, hardware,, address,, other misc.
|
BLD-Energy code compliance | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Dave Hannah
|
|
|
Retail space insulation Phone #: ###-#### Inspection requested via web by Bob Ledford
|
BLD-Framing/Rough-in | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Dave Hannah
|
|
|
Pod #3 Live Work, framing at demising wall Phone #: ###-#### Inspection requested via web by Bob Ledford
|
BLD-Framing/Rough-in | 6/2/2017 | 6/5/2017 | 6/6/2017 | P | PART |
Dave Hannah
|
|
|
Retail space at ground level northeast corner, including demising wall with Live work space #6 pod 3 Phone #: ###-#### Inspection requested via web by Bob Ledford ok to insulate work/tenent side
|
BLD-Energy code compliance | 6/1/2017 | 6/2/2017 | 6/2/2017 | P | PASS |
Jim Sly
|
|
|
PM Live work #6, Pod #3, energy code. Phone #: ###-#### Inspection requested via web by Bob Ledford
|
BLD-Framing/Rough-in | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PART |
Jim Sly
|
|
|
AM Live work #6, Pod #3, framing Phone #: ###-#### Inspection requested via web by Bob Ledford All OK except......East wall.
|
BLD-Framing/Rough-in | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Tony Young
|
|
|
Pete-garage Phone #: ###-####,, ok to insulate
|
BLD-Energy code compliance | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Tony Young
|
|
|
Pete-2nd floor Phone #: ###-####
|
BLD-Energy code compliance | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Tony Young
|
|
|
Pete Phone #: ###-####
|
BLD-Wall cover | 5/24/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Tony Young
|
|
|
2nd floor // Pete Phone #: ###-####,, soffits east side
|
BLD-Framing/Rough-in | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Tony Young
|
|
|
2nd floor // Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2017 | 5/23/2017 | 5/23/2017 | A | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-####, Pod 3, 2nd and 3rd floors ok to insulate 3rd fl pod 3
|
BLD-Framing/Rough-in | 5/19/2017 | 5/22/2017 | 5/23/2017 | A | NR |
Tony Young
|
|
|
Pete Phone #: ###-####
|
FIRE-Conference | 5/19/2017 | 5/22/2017 | 5/22/2017 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Energy code compliance | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Tony Young
|
|
|
Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### ok to insulate 1st floor pod 4
|
BLD-Energy code compliance | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | PASS |
Brandon Shaw
|
|
|
As late in the afternoon as possible // Pete Phone #: ###-#### Second story, second pod
|
BLD-Framing/Rough-in | 5/9/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Tony Young
|
|
|
Pete-2nd floor Phone #: ###-####,, ok to insulate pending trades
|
BLD-Energy code compliance | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### third fl pod 4 ok
|
BLD-Framing/Rough-in | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | PASS |
Dave Hannah
|
|
|
pete Phone #: ###-#### third floor pod 4 ok to insulate
|
FIRE-Conference | 4/28/2017 | 5/1/2017 | 5/1/2017 | A | PART |
Jim Page
|
|
|
Fire conference complete, awaiting answer from fire sprinkler plan reviewer for acceptance of proposed method to prevent pipe from freezing over top of breezeway.
|
BLD-Energy code compliance | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | PASS |
Tony Young
|
|
|
Pete Phone #: ###-####,, soffit areas on exterior beyond support beams on north/east ok to cover
|
BLD-Framing/Rough-in | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, ok to insulate soffit areas,, letter from engineer to plan review
|
BLD-Framing/Rough-in | 4/21/2017 | 4/24/2017 | 4/24/2017 | A | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, soffit areas,, ok pending approval from engineer
|
BLD-Energy code compliance | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | PART |
Tony Young
|
|
|
Energy // Pete Phone #: ###-####,, same areas as frame,, electric room, east soffit on pod 3 ok
|
BLD-Framing/Rough-in | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PART |
Mike Jordan
|
|
|
Pete-pod 2 and electric room and exterior facet in pod 4 Phone #: ###-#### Ok to insulate electrical room, need to complete column wraps. framing at pod soffits ok, ok to insulate.
|
BLD-Energy code compliance | 4/6/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Tony Young
|
|
|
Pete-pod 2-1st floor Phone #: ###-####
|
BLD-Framing/Rough-in | 4/4/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Tony Young
|
|
|
Pete-1st floor Phone #: ###-####, ok to insulate
|
BLD-Energy code compliance | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Tony Young
|
|
|
Pete-2nd floor Phone #: ###-####
|
BLD-Energy code compliance | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Tony Young
|
|
|
pete Phone #: ###-####,, room ok as noted before
|
BLD-Energy code compliance | 3/31/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Mike Jordan
|
|
|
Deek Phone #: ###-####. POd #2 3rd floor ok, except for unit #306.
|
BLD-Framing/Rough-in | 3/28/2017 | 3/28/2017 | 3/28/2017 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-####. Ok to insualte.
|
BLD-Framing/Rough-in | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, upper level ok,, ok to insulate,, pod 2
|
BLD-Wall Bracing | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PART |
Tony Young
|
|
|
Shear // Pete Phone #: ###-####,, exterior shear ok
|
BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, roof nailing,, self certified
|
BLD-Blower Door Test Results | 3/8/2017 | 3/9/2017 | 3/9/2017 | A | PASS |
Tony Young
|
|
|
Pete-soffit and drop ceiling Phone #: ###-####,, pod 1
|
BLD-Energy code compliance | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Tony Young
|
|
|
Pete Phone #: ###-####,, pod 1 storage room riser room,, garage,, 1st floor ok
|
BLD-Framing/Rough-in | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | PASS |
Tony Young
|
|
|
1st Floor.... Late morning // Pete Phone #: ###-####,, 1st floor on pod 1 ok to insulate,, need to verify if straps are needed and if headers on front wall are needed
|
BLD-Energy code compliance | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Tony Young
|
|
|
Second floor - Pete Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2017 | 3/1/2017 | 3/1/2017 | A | PASS |
Tony Young
|
|
|
Pod 1 - 2nd floor, Pete Phone #: ###-####// ok to insulate
|
BLD-Wall Bracing | 2/27/2017 | 2/28/2017 | 2/28/2017 | P | PART |
Tony Young
|
|
|
Pod 3 - Pete Phone #: ###-####,,
|
BLD-Other | 2/24/2017 | 2/27/2017 | 2/27/2017 | P | PART |
Tony Young
|
|
|
Late, please for Insulation over fire sprinkler - Pete Phone #: ###-####,, ok pending sprinkler permit tenting pass,, 3rd floor west pod
|
BLD-Energy code compliance | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | NR |
Tony Young
|
|
|
Pete Phone #: ###-####,, pod 1,, upper level
|
BLD-Energy code compliance | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | NR |
Tony Young
|
|
|
Pete Phone #: ###-####
|
BLD-Energy code compliance | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | NR |
Tony Young
|
|
|
Pete Phone #: ###-####,, needs fire pass
|
BLD-Framing/Rough-in | 2/22/2017 | 2/23/2017 | 2/23/2017 | P | PART |
Tony Young
|
|
|
As last as possible // Pete Phone #: ###-####,, pod 1 3rd floor ok to insulate
|
BLD-Wall Bracing | 2/13/2017 | 2/14/2017 | 2/14/2017 | P | PART |
Tony Young
|
|
|
Pete Phone #: ###-####,, pod 1 interior shear ok and 2nd level on pod 3 ok to stand interior wall
|
BLD-Conference | 1/31/2017 | 2/1/2017 | 2/1/2017 | A | PEND |
Tony Young
|
|
|
Pete Phone #: ###-####,, ?s about split occupancy
|
FIRE-Conference | 1/31/2017 | 2/1/2017 | 2/1/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Conference | 1/30/2017 | 1/31/2017 | 1/31/2017 | P | CANC |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Conference | 1/30/2017 | 1/31/2017 | 1/31/2017 | P | CANC |
Jim Page
|
|
|
Conference rescheduled for 01FEB2017
|
BLD-Wall Bracing | 1/9/2017 | 1/9/2017 | 1/9/2017 | P | PART |
Tony Young
|
|
|
Joe// please call before Phone #: ###-####,, exterior shear nailing,, ok with minor fixes
|
BLD-Framing/Rough-in | 12/20/2016 | 12/21/2016 | 12/21/2016 | P | NR |
Tony Young
|
|
|
Joe Phone #: ###-####,, walk through only
|
BLD-Wall Bracing | 12/20/2016 | 12/21/2016 | 12/21/2016 | P | PART |
Tony Young
|
|
|
Joe Phone #: ###-####,, work in progress on grid 4,, 4th floor,, ok
|
BLD-Conference | 12/7/2016 | 12/12/2016 | 12/15/2016 | A | PEND |
Tony Young
|
|
|
Joe Phone #: ###-####,, firewall continuation ?,, see plan review
|
BLD-Conference | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | PEND |
Tony Young
|
|
|
Joe Phone #: ###-####,, firewall continuation ?,, see plan review,,
|
BLD-Framing/Rough-in | 12/5/2016 | 12/6/2016 | 12/6/2016 | P | PART |
Tony Young
|
|
|
Joe Phone #: ###-####,, upper shear wall same as last lower,, ok,, wip
|
BLD-Wall Bracing | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PART |
Tony Young
|
|
|
Joe// 3pm works best Phone #: ###-####,, line 7 shear nailing ok
|
BLD-Wall Bracing | 10/17/2016 | 10/18/2016 | 10/18/2016 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, met with Nate the frame foreman,, grid 1-4 and west side of 4-7 shear ok,, fire blocks via insulation between walls in place
|
BLD-Foundation | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | PART |
Dave Hannah
|
|
|
Joe Phone #: ###-#### planters
|
BLD-Foundation | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PASS |
Mike Jordan
|
|
|
Joe-stem wall-pour time 12:30 Phone #: ###-####. Gridlines 8.3 to 12 and E to H.
|
BLD-Footing | 9/13/2016 | 9/15/2016 | 9/15/2016 | A | PEND |
Dave Hannah
|
|
|
Concrete at 10AM - Joe Phone #: ###-#### ok after mti signs off
|
BLD-Concrete | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PEND |
Tony Young
|
|
|
Concrete at 4am // Joe Phone #: ###-####,, north area slab and interior slab footings,, special inspector will be on site,, work in progress
|
BLD-Footing | 8/30/2016 | 9/1/2016 | 9/1/2016 | P | NR |
Phil Shearer
|
|
|
concret slab wand struc footings-pour time Friday 4:00 AM Phone #: ###-####
|
BLD-Concrete | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PART |
Tony Young
|
|
|
11:00am pour; Joe Phone #: ###-####
|
BLD-Footing | 8/19/2016 | 8/22/2016 | 8/22/2016 | A | PEND |
Tony Young
|
|
|
Joe-concrete footing placement-pour time 1:00 Phone #: ###-####
|
BLD-Concrete | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Jim Storey
|
|
|
Concrete at 1230 // Joe Phone #: ###-#### walls grid line 4-7 ok
|
BLD-Concrete | 8/11/2016 | 8/15/2016 | 8/15/2016 | A | PART |
Tony Young
|
|
|
Joe Phone #: ###-####-pour time 12:30,, special inspection pending
|
BLD-Foundation | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | PEND |
Tony Young
|
|
|
Joe Phone #: ###-####,, special inspector on site
|
BLD-Footing | 8/3/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Phil Shearer
|
|
|
Joe Phone #: ###-####
|