BLD-Final | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
Dave Hannah
|
|
|
Larren Phone #: ###-####
|
BLD-Final | 6/30/2016 | 6/30/2016 | 7/12/2016 | P | FAIL |
Dave Hannah
|
|
|
Larren-see docuiments for letter on temp glass-mech not signed off so if not needed can you please sign off on the card Phone #: ###-####
|
BLD-Final | 6/27/2016 | 6/27/2016 | 6/28/2016 | P | PEND |
Dave Hannah
|
|
|
Larren Phone #: ###-#### temp glassing
|
BLD-Final | 6/2/2016 | 6/6/2016 | 6/7/2016 | P | PART |
Dave Hannah
|
|
|
Larren Phone #: ###-#### ok for temp needs to install conf rm glassing
|
FIRE-Final Inspection | 6/6/2016 | 6/6/2016 | 6/6/2016 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguisher is in place with current inspection tag. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 6/2/2016 | 6/3/2016 | 6/3/2016 | A | CANC |
Jim Page
|
|
|
Contacted Larren Phone #: ###-#### for final life fire safety inspection, area of work still has a FIR permit for fire alarms in issued status, cannot complete life fire safety inspection until FIR permit for fire alarms has benn inspected/ has been finaled. This inspection request cancelled.
|
BLD-Framing/Rough-in | 4/25/2016 | 4/25/2016 | 4/26/2016 | P | PASS |
Dave Hannah
|
|
|
Larren Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2016 | 4/22/2016 | 4/24/2016 | P | DONE |
Dave Hannah
|
|
|
Larren Phone #: ###-####
|
BLD-Framing/Rough-in | 4/21/2016 | 4/22/2016 | 4/23/2016 | A | PEND |
Dave Hannah
|
|
|
Larren Phone #: ###-#### needs to remove screws fro top track that are in grid
|