BLD-Final | 9/29/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Tony Young
|
|
|
Access is around right side to door off rear porch - there are no dogs, fence is to keep stray and deer out. Plans on site in bay window. Phone #: ###-#### Inspection requested via web by Andrew George
|
DOC - Permit Finaled | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | NR |
Tony Young
|
|
|
Access is around right side to door off rear porch - there are no dogs, fence is to keep stray and deer out. Plans on site in bay window. Phone #: ###-#### Inspection requested via web by Andrew George,, ok pending plumbing final
|
BLD-Energy code compliance | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Tony Young
|
|
|
Reinspect the air seal, framing corrections and energy code - all competed and plans on site, access is from the west side - walk around and enter through door on rear patio, hog wire fence is to keep dogs out of yard not in yard so no pets on site - thanks Tony Phone #: ###-#### Inspection requested via web by Andrew George
|
BLD-Framing/Rough-in | 6/21/2016 | 6/22/2016 | 6/22/2016 | A | PART |
Tony Young
|
|
|
Plans are on site. Access is on west side and go around. I do not see where framer coordinated shear inspection - if we need to remove Tyvek please advise. AC unit inside room is being relocated to outside once shell is sealed up. Window missing was damaged at shipping and arriving Tuesday
Thanks. Phone #: ###-#### Inspection requested via web by Andrew George,, need to add blocking for shear and nail off,, need to verify seal pack,, need hold down on porch trusses,, strap top plates,, new to existing and where not overlapped 24",, ok to insulate
|
BLD-Framing/Rough-in | 6/21/2016 | 6/22/2016 | 6/21/2016 | P | CANC |
Tony Young
|
|
|
Access through area of new construction on west side of house, plans on site Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
|
BLD-Conference | 6/21/2016 | 6/22/2016 | 6/21/2016 | A | CANC |
Tony Young
|
|
|
Plans on site, enter from west side and go around. I do not see that my framer coordinated shear panel inspection, if we need to remove tyvek we will please advise. AC inside unit is moving to outside once sealed up. A window was damaged upon arrival and is to be installed in one week. Thanks. Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
|
BLD-Footing | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Tony Young
|
|
|
Support columns - Kevin Phone #: ###-####
|
BLD-Foundation | 5/13/2016 | 5/16/2016 | 5/16/2016 | A | PART |
Tony Young
|
|
|
Kevin Phone #: ###-####,, work in progress
|
BLD-Footing | 5/12/2016 | 5/13/2016 | 5/13/2016 | A | PASS |
Dave Hannah
|
|
|
Andrew Phone #: ###-####
|
BLD-Footing | 5/10/2016 | 5/11/2016 | 5/11/2016 | A | CANC |
Tony Young
|
|
|
Can we coordinate a footing inspection for 11-12? We have mud scheduled for 1pm. Its only a 24x24 area to look at. Thanks!! Phone #: ###-#### >> Inspection requested via web by Andrew George Inspection cancelled from web by: Andrew George
|