BLD-Final | 10/13/2016 | 10/14/2016 | 10/14/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Final | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | DEFR |
Phil Shearer
|
|
|
Hardware for panic bar is being installed early afternoon Phone #: ###-#### Inspection requested via web by kevin debelloy. Out of time
|
FIRE-Final Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Jim Page
|
|
|
Previously noted item in regards to the northwest door hardware has been repaired, final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 10/10/2016 | 10/11/2016 | 10/11/2016 | P | PART |
Jim Page
|
|
|
Partial final inspection for area of work complete, the west side exterior doors both have double keyed deadbolts installed, one door is allowed the double keyed deadbolt. After discussing issue with superintendent the north door is going to have single action or panic door hardware installed. Final fire sprinkler inspection is complete, final fire alarm inspection is complete, final commercial hood fire suppression system inspection is complete, class K extinguisher has a current inspection tag and will be mounted in discussed location, ABC extinguisher is mounted in a common area with a current inspection tag. Life fire safety can be signed as passed/complete after door hardware is replaced on northwest exterior exit door and verfied for proper installation/operation.
|
BLD-Ceiling Grid Inspection | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD-Framing/Rough-in | 8/11/2016 | 8/12/2016 | 8/12/2016 | A | NR |
Dave Hannah
|
|
|
I would like to be on site for inspection with a 30 min heads up Phone #: ###-#### Inspection requested via web by kevin debelloy needs elec rough in and fire caulking piping though floor
|