Permit Information
Permit NumberBLD16-00766
StatusFinaled
Name BENITON CONSTRUCTION
Site Address 12095 W USTICK RD
Project NameMaverik Boise 240
Customer Number 
ePlanReviewYes
Description
(MAVERIK - Store #240) Special Inspections Required see form 310. Permit to construct a new 5,518 square foot mercantile station, trash enclosure, trellis and fuel canopy. Special inspections per #310 form. All signs shall be reviewed under a separate permit. Scope of work to include all site work related to this project as shown on the approved drawings. Building shall include foundation, walls, roof construction and interior TI as shown on approved drawings. Interior finish material shall meet IBC chapter 8. All associated trade work for plumbing, mechanical and electrical shall obtain all required permits and inspections. This building is NOT fire sprinklered. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201612/12/201612/12/2016PPASS
DetailsJim Sly
Jam Phone #: ###-####
OK for Perm Occ.
BLD-Final12/6/201612/6/201612/8/2016PPART
DetailsJim Sly
Beniton Phone #: ###-####
OK for Temp Occ. OK for Perm Occ. when.....2 separate exit doors at North side of Bldg have double keyed locks with indicators installed.
FIRE-Supply Line Hydro12/7/201612/8/201612/8/2016APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection12/6/201612/7/201612/7/2016APART
DetailsTroy Cobbley
A fire watch is to be inplace as per Fire Dept and the contractor discussion for tonight. I'm scheduled for a final re-inspection for tomorrow morning for the testing of the two duct smoke detectors. Jim Sly is going to cover the main exit door hardware. I need to verify with the Fire Dept that all items for their tank inspection have be addressed. All other items appear ok.
BLD-Ceiling Grid Inspection11/18/201611/21/201611/21/2016APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jan Tietjen
BLD-Energy code compliance10/20/201610/21/201610/21/2016PPASS
DetailsJim Sly
Jam Phone #: ###-####
BLD-Framing/Rough-in10/19/201610/19/201610/19/2016APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Jan Tietjen
BLD-Energy code compliance10/4/201610/5/201610/5/2016APART
DetailsJim Sly
Jan Phone #: ###-####
Walls behind coolers ......OK.
BLD-Wall Bracing9/30/201610/3/201610/3/2016PPASS
DetailsJim Sly
Dan Phone #: ###-####
BLD-Conference9/26/20169/26/20169/26/2016PDONE
DetailsJim Sly
Jam Phone #: ###-####
Walk Thru with Jan........Strata hired to do all special inspections.Exterior walls and roof framing almost complete.....went over wall bracing.
BLD-Foundation8/22/20168/23/20168/23/2016PPASS
DetailsJim Storey
Janan Phone #: ###-#### placed w si
BLD-Foundation8/17/20168/18/20168/18/2016APEND
DetailsJim Sly
Late morning .......Rebar // Jay Phone #: ###-####
Inspection of Footings for entire building. STRATA will be doing all special inspections. OK to pour with approval from STRATA and Stamped Approved plans are on site. No approved planson site at this time.
BLD-Footing8/12/20168/15/20168/15/2016APASS
DetailsMike Jordan
Jan-rebar-pour time 2:30 Phone #: ###-####. column footings for canopy. Will have special inspection.