Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD16-00775
StatusFinaled
Name TOWNER DAVID K
Site Address 3299 E RED STONE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Hillside and WUI Zone A ** Scope of work is to add a addition of an attached shed to the existing home. The storage area is 242 sq. ft. and is unconditioned and nonhabitable space. Work will be performed per the approved plans, stamped engineered drawing for the foundation and local codes. An electrical permit will be pulled separately. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/11/20186/12/20186/12/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by David Towner
DOC - Permit Finaled6/12/20186/12/20186/12/2018PPASS
DetailsJim Storey
BLD - Request for Extension3/15/20183/15/20183/15/2018PPASS
DetailsBrandon Shaw
David Phone #: ###-####
BLD-Aging Inspection11/22/201711/22/201711/24/2017 DONE
DetailsBrandon Shaw
BLD-Aging Inspection11/21/201711/21/201711/21/2017 DONE
DetailsBrandon Shaw
Work in progress
BLD-Conference10/15/201710/16/201710/16/2017ADONE
DetailsBrandon Shaw
Request conference to discuss flashing at juncture of new roof and existing house wall. Phone #: ###-#### Inspection requested via web by David Towner
BLD-Framing/Rough-in7/7/20177/7/20177/10/2017PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by David Towner
BLD-Conference7/2/20177/3/20177/3/2017ADONE
DetailsBrandon Shaw
Request preliminary wall framing inspection and consultation before sheathing. Phone #: ###-#### Inspection requested via web by David Towner
BLD-Other6/5/20166/6/20166/6/2016PPASS
DetailsPhil Shearer
Request foundation wall forming and rebar inspection. Phone #: ###-#### Inspection requested via web by David Towner
BLD-Conference5/17/20165/18/20165/18/2016APEND
DetailsPhil Shearer
Preliminary rebar inspection requested. I would like to verify that the rebar work is acceptable before forming the foundation walls. Mid to late morning is preferred. Thanks. Phone #: ###-#### Inspection requested via web by David Towner
BLD-Other4/28/20164/29/20164/29/2016APASS
DetailsPhil Shearer
Footing and Foundation Inspection requested. Mid to late morning preferred. Phone #: ###-#### Inspection requested via web by David Towner
BLD-Conference4/6/20164/6/20164/6/2016PDONE
DetailsPhil Shearer
I''d like to discuss routing domestic water supply line through footing. Phone #: ###-#### Inspection requested via web by David Towner
BLD-Other3/11/20163/15/20163/15/2016PCANC
DetailsPhil Shearer
Andy did the site prep 3-11 // Erosion Inspection ESC16-00329
Phone #: ###-#### >> Inspection requested via web by David Towner