Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-00810
StatusFinaled
Name PETRA INC
Site Address 5493 E WARM SPRINGS AVE
Project NameRiverstone Middle+High Phase 1
Customer Number 
ePlanReviewYes
Description
(RIVERSTONE MIDDLE + HIGH SCHOOL - Classroom Building) Permit is to construct a new 7,000 square foot middle / high school. This building is being sprinklered for non-rated corridors and future expansions. Approval contingent upon adhering to the approved plans on file. Work to include: removal of two existing portable classroom buildings, removal of two existing canopys on separate adjacent buildings, construction of poured concrete foundation, construction of new wood frame building, [installation of new nonbearing walls to create five classrooms, two storage rooms, separate sex accessible restrooms, two offices, a hallway, and a small break out classroom], new electrical, new mechanical, new plumbing, and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/5/201612/5/201612/5/2016PPASS
DetailsPhil Shearer
JC Phone #: ###-####
BLD-Final12/1/201612/2/201612/2/2016PPART
DetailsPhil Shearer
jc Phone #: ###-#### Handrail of ramps need to be the full length of the ramp and extend 1' past the end. OK for temp
FIRE-Final Inspection12/1/201612/2/201612/2/2016APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection11/9/201611/10/201611/10/2016PPASS
DetailsPhil Shearer
would like late afternoon; JC Phone #: ###-####
BLD-Framing/Rough-in10/26/201610/27/201610/27/2016PPASS
DetailsPhil Shearer
hard lid restrooms // JC Phone #: ###-####
BLD-Energy code compliance10/11/201610/11/201610/11/2016PPASS
DetailsPhil Shearer
jc Phone #: ###-####
BLD-Framing/Rough-in10/5/201610/5/201610/5/2016PPASS
DetailsPhil Shearer
JC Phone #: ###-####
BLD-Framing/Rough-in9/27/20169/28/20169/28/2016APASS
DetailsPhil Shearer
East side of roof
BLD-Framing/Rough-in9/27/20169/27/20169/27/2016PDEFR
DetailsPhil Shearer
East side of roof
BLD-Framing/Rough-in9/26/20169/27/20169/27/2016APASS
DetailsPhil Shearer
West side of roof
BLD-Framing/Rough-in9/26/20169/26/20169/26/2016PNR
DetailsPhil Shearer
BLD-Framing/Rough-in9/23/20169/26/20169/26/2016ANR
DetailsPhil Shearer
JC Phone #: ###-####
BLD-Framing/Rough-in9/22/20169/23/20169/23/2016PNR
DetailsPhil Shearer
Roof // JC Phone #: ###-####