BLD-Final | 8/8/2016 | 8/9/2016 | 8/9/2016 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 8/9/2016 | 8/9/2016 | 8/9/2016 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 8/1/2016 | 8/1/2016 | 8/2/2016 | P | FAIL |
Tony Young
|
|
|
Call for access // John Phone #: ###-####,, needs address posted,, hand rails installed
|
BLD-Final | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | FAIL |
Jim Sly
|
|
|
Call for access // John Phone #: ###-#### Per Sect R 401.3 2012 IRC Surface drainage shall be diverted to a storm sewer or other approved point of collection. It appears that water from this property will drain onto other properties ........especially in a bad storm.
|
BLD-Energy code compliance | 6/3/2016 | 6/6/2016 | 6/6/2016 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2016 | 6/2/2016 | 6/2/2016 | P | PASS |
Jim Sly
|
|
|
John Phone #: ###-####
|
BLD-Conference | 5/31/2016 | 6/1/2016 | 6/1/2016 | A | PART |
Tony Young
|
|
|
Neighbor (Conner) located in the house to the west of this project at 7688 N. Goodyear Way is complaining that the CBH foundation is sitting well above his and is afraid of run-off water. He's contacted CBH several times but nothing has been done.,, it appears that both homes have and will have sufficiant drainage away from both homes and will drain away acceptable,, I called the job super and talked about keeping all run off on his own property,, he stated that no sprinklers will be on that side as well
|
BLD-Wall Bracing | 5/20/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 5/2/2016 | 5/3/2016 | 5/4/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 4/29/2016 | 5/2/2016 | 5/2/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|