Description
(ARBORETUM AT BARBER STATION – Building #2) Permit to construct a new 123,212 square foot (5) story apartment building. First floor foundation and concrete podium permit submitted under BLD15-04486. Each floor is approximately 24,405 square feet. Approval contingent upon adhering to the approved plans on file and attached engineering. This building is fully fire sprinklered with an NFPA 13 system to comply with special provisions of section 510.2 and area increase. Scope of work includes: interior finish of the first floor, construction of wood frame 4 story building on top of the previously approved podium, installation of interior non-bearing walls and bearing walls to create 80 individual units, new plumbing, new electrical, new mechanical, new insulation, new windows, new doors, and interior finishes in compliance with Chapter 8 of the 2012 IBC. This building will be sprinklered with a fully compliant NFPA 13 system to comply with special provisions of section 510.2 and area increase. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/28/20186/29/20186/29/2018APASS
DetailsJim Sly
looks like everyone has signed off but you only have a partial final
OK for perm Occ.
BLD-Aging Inspection4/17/20184/17/20184/23/2018 CANC
DetailsJim Sly
BLD-Aging Inspection2/14/20182/14/20182/15/2018 DONE
DetailsBrandon Shaw
Work in progress
BLD-Final12/4/201712/4/201712/4/2017APART
DetailsJim Sly
Late Morning Please. Phone #: ###-#### Inspection requested via web by Michael West
OK for Temp. Occ. OK for Perm. Occ. When Electr, Mech, Plumb and Zoning signs for Perm Occ.
FIRE-Final Inspection12/4/201712/4/201712/4/2017APASS
DetailsJim Page
Building 2 fire sprinkler inspection complete, building 2 fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is located by main entry. Final life fire safety inspection for buidling 2 passed/complete.
FIRE-Final Inspection11/30/201712/1/201712/1/2017AFAIL
DetailsJim Page
Fire alarm modifications not completed at time of inspection, life fire safety inspection stopped.
FIRE-Alarm Testing11/30/201712/1/201712/1/2017ACANC
DetailsJim Page
Fire alarm testing/inspection is to be requested by the installing contractor under the associated FIR permit, this request is cancelled.
FIRE-Final Inspection11/30/201711/30/201711/30/2017AFAIL
DetailsJim Page
Need 18 inches of clearance from bottom of fire sprinkler deflector to top of storage (closets and pantries are the main issue). No exterior signage for roof access or fire sprinkler riser room. Provide emergency lighting for exit discharge landings. FIR permits for both fire sprinkler and fire alarm need to be finaled before life fire safety inspection can be completed.
BLD-Final11/30/201711/30/201711/30/2017APEND
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Michael West
Pre-inspection....walk thru.
BLD-Ceiling Grid Inspection11/10/201711/13/201711/13/2017APASS
DetailsJim Sly
Level 5 and Level 4 Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in11/3/201711/3/201711/3/2017PPART
DetailsBrandon Shaw
Level 1 elevator lobby.

OK to cover
BLD-Framing/Rough-in9/21/20179/22/20179/22/2017APASS
DetailsJim Sly
Units 211-220 drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in9/18/20179/19/20179/19/2017APASS
DetailsJim Sly
Elevator lobby ceilings at levels 2 and 3. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in9/5/20179/6/20179/6/2017APASS
DetailsJim Sly
Units 311-320 Drop Ceilings Ready to cover. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in9/1/20179/1/20179/1/2017PNR
DetailsJim Sly
Units 311-320 Drop Ceilings and Soffits Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/24/20178/24/20178/24/2017PPASS
DetailsJim Sly
Units 411-420 soffits and drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/16/20178/16/20178/17/2017PPASS
DetailsJim Sly
Units 511-520 Soffits and drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in8/14/20178/14/20178/14/2017PNR
DetailsJim Sly
Units 511-520 Soffits and Drops to cover with gyp-board. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in7/18/20177/19/20177/19/2017APASS
DetailsJim Sly
Units 201-210 Phone #: ###-#### Inspection requested via web by Michael West
BLD-Conference7/18/20177/18/20177/18/2017PCANC
DetailsJim Sly
BLD-Framing/Rough-in7/14/20177/14/20177/17/2017PPART
DetailsBrandon Shaw
Level 3 drop ceilings Phone #: ###-#### Inspection requested via web by Michael West
BLD-Energy code compliance6/29/20176/29/20176/29/2017PPASS
DetailsJim Sly
Mike West Phone #: ###-####
BLD-Energy code compliance6/29/20176/29/20176/29/2017APART
DetailsBrandon Shaw
Units 411-420 insulation
BLD-Framing/Rough-in6/21/20176/21/20176/21/2017PPART
DetailsBrandon Shaw
Units 511-520 Framing Phone #: ###-#### Inspection requested via web by Michael West
Units 511-520
BLD-Framing/Rough-in6/7/20176/7/20176/7/2017PPART
DetailsJim Sly
Mike Phone #: ###-####
3rd level OK.
BLD-Framing/Rough-in6/1/20176/2/20176/2/2017APASS
DetailsJim Sly
UNits 211- thru 220 - Mike Phone #: ###-####
BLD-Framing/Rough-in5/31/20175/31/20175/31/2017PNR
DetailsJim Sly
Units 211-220 ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
Electr. needs to complete firestopping.
BLD-Energy code compliance4/28/20175/1/20175/1/2017APASS
DetailsJim Sly
Level 3 units 301-310 Insulation ready for GWB install. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in4/25/20174/25/20174/25/2017PPART
DetailsJim Sly
Units 301-310 Ready to insulate. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in4/18/20174/18/20174/18/2017PPASS
DetailsJim Sly
Level 4 units 401-410 framing. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Wall cover4/13/20174/13/20174/13/2017PPASS
DetailsJim Sly
Units 501-510 Insulation Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in4/4/20174/5/20174/5/2017APART
DetailsJim Sly
Level 5 units 501-510 Framing for insulation to start Phone #: ###-#### Inspection requested via web by Michael West
BLD-Framing/Rough-in3/2/20173/2/20173/2/2017APART
DetailsJim Sly
Pre-rock corridor ceilings and 4'' down the wall at levels 2,3,4 and 5 West half of building. Phone #: ###-#### Inspection requested via web by Michael West OK
BLD-Framing/Rough-in2/28/20172/28/20172/28/2017PPART
DetailsJim Sly
Pre-rock at tubs for units 501-510 and 401-410. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Wall Bracing2/17/20172/21/20172/21/2017APART
DetailsMike Jordan
Shear walls Units401-410 Phone #: ###-#### Inspection requested via web by Michael West. Interior shear walls for corrido walls at first floor. Nailing ok. Needs to install holdowns.
BLD-Framing/Rough-in2/15/20172/16/20172/16/2017APART
DetailsJim Sly
Roof sheathing and level 5 units 501-510 shearwall nailing. Phone #: ###-#### Inspection requested via web by Michael West
OK pending MTI special inspections, tests and approvals.
BLD-Conference2/13/20172/14/20172/15/2017APEND
DetailsBob Archibald
Requesting an inspection to clarify whether the use of a generator for elevator operation in the event of a power failure is required, or if a battery backup lowering function is sufficient to meet code. Phone #: ###-#### Inspection requested via web by Michael West. Backup Power question under review.
BLD-Conference1/27/20171/31/20172/13/2017ANR
DetailsDave Hannah
Consultation to discuss inspections as we move into the framing and finishes stages. Phone #: ###-#### Inspection requested via web by Michael West
BLD-Conference12/13/201612/13/201612/13/2016PDONE
DetailsPhil Shearer
Phone #: 8013815319 >> Inspection requested via mobile web by Mike west