BLD-Final | 9/21/2016 | 9/22/2016 | 9/22/2016 | A | PASS |
Jim Sly
|
|
|
Please call Phill when on site. ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen
|
DOC - Permit Finaled | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
BLD-Final | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PART |
Jim Sly
|
|
|
Meat/ Seafood Department Final. Please Call Phil when on site ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen Partial.......OK to occupy Seafood Dept.
|
FIRE-Final Inspection | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PART |
Troy Cobbley
|
|
|
Life Safety for Seafood Department passed.
|
BLD-Framing/Rough-in | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PART |
Jim Sly
|
|
|
Seafood Drop Soffit Framing. Please call Phil when on site. ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen Seafood Soffit OK.
|
BLD-Final | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PART |
Jim Sly
|
|
|
BLDG Final- Deli Call Phil when here ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen Deli OK to occupy.
|
FIRE-Conference | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | DONE |
Troy Cobbley
|
|
|
Went over life safety requirements with Phil
|
FIRE-Final Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 | P | PART |
Troy Cobbley
|
|
|
Fire life safety for the new Deli area passed.
|
BLD-Framing/Rough-in | 7/25/2016 | 7/25/2016 | 7/25/2016 | A | PART |
Jim Sly
|
|
|
Framing inspection for pharmacy wall framing. Phil Allen is day superintendent Phone #: ###-#### Inspection requested via web by Ron Hack Pharmacy....OK
|
BLD-Framing/Rough-in | 6/14/2016 | 6/14/2016 | 6/14/2016 | A | PASS |
Jim Sly
|
|
|
Please call Phil Allen when on site ###-#### Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Framing/Rough-in | 5/22/2016 | 5/23/2016 | 5/23/2016 | A | PASS |
Mike Jordan
|
|
|
Please call when on site. Framing for new CCK ; Teller rooms adjacent to Electronics in front of store. Phone #: ###-#### Inspection requested via web by Philip Allen. iNterior steel stud framed walls and hardlid for new CCK and teller rooms.
|