Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD16-01427
StatusFinaled
Name ESI
Site Address 4481 W WILLOW LN
Project NameSerena House - New Building
Customer Number 
ePlanReviewYes
Description
(SERENA HOUSE – NEW BUILDING – TRANSITIONAL HOUSING - EXPANSION OF CAMPUS) (CUP15-00079) (9-30-16 PLAN MODIFICATION TO CHANGE THE ROUTING OF MECHANICAL DUCTS AND TO SHOW CEILING RADIATION DAMPERS AND FIRE/SMOKE DAMPERS.) (8-9-16 PLAN MODIFICATION TO REVISE THE KITCHENS TO INCLUDE AN OVERHEAD DOOR LISTED AND LABELED FOR A FIRE-RESISTANCE-RATED CORRIDOR WALL. DOOR SHALL BE AUTOMATIC CLOSING BY ACTUATION OF SMOKE DETECTORS.) The fire sprinkler system per NFPA 13 is used to allow dead end corridors more than 20 feet long and as required for R-2 Occupancies. To construct a 10,382 square foot building (5,355 square feet 1st story and 5,027 square feet 2nd story) to be used for transitional housing for women and children (4,492 square feet 1st story and 4,264 square feet 2nd story) and for offices (762 square feet 1st story and 719 square feet 2nd story). Work is to include concrete footings, concrete foundation, concrete slab on grade, wood stud exterior walls, interior and exterior shear walls, interior and exterior bearing walls, wood floor joists, wood roof trusses, wood sheathing for floor and roof diaphragms, asphalt shingles, wood siding, fiber cement siding, exterior windows, exterior doors, one interior stairway, one interior stairway rated like a corridor, one exterior stairway, interior fire-rated corridors, interior nonbearing walls, interior doors, millwork, and interior finishes. The restroom that serves the office area is required to be accessible to the disabled. Two sleeping rooms and their restrooms on the 1st story are required to comply as accessible units. All other sleeping rooms and their restrooms on the 1st story are required to comply as Type B sleeping units. Special Inspection required for soils, concrete, welding, wood diaphragms, and wood shear walls. Metal plate wood trusses are a deferred submittal item. New concrete steps and handrails, a new trash enclosure, and a new 250 square foot storage shed will be constructed at or near the existing “T” shaped building. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system, if provided, is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/20/201612/21/201612/21/2016APASS
DetailsTony Young
Dusty Phone #: ###-####,, ok for perm occupancy
BLD-Final12/19/201612/20/201612/20/2016APEND
DetailsTony Young
Dusty Phone #: ###-####
BLD-Final12/16/201612/19/201612/19/2016APART
DetailsTony Young
Dusty Phone #: ###-####,, back railings not 100% yet
BLD-Final12/15/201612/16/201612/16/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, Temp occ. ok,, just working on the hand/guard rail off the back deck area
FIRE-Final Inspection12/15/201612/16/201612/16/2016APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final12/6/201612/7/201612/7/2016PNR
DetailsTony Young
Dusty Phone #: ###-####,, need f/l/s,, walk through,, c/n posted
BLD-Wall cover10/13/201610/14/201610/14/2016APASS
DetailsTony Young
Dusty Phone #: ###-####,, interior drywall bracing ok
BLD-Wall Bracing10/12/201610/13/201610/13/2016PDEFR
DetailsTony Young
Dusty Phone #: ###-####
BLD-Foundation10/6/201610/7/201610/7/2016APASS
DetailsJim Sly
trash enclosure; Dusty Phone #: ###-####
BLD-Energy code compliance9/28/20169/30/20169/30/2016APART
DetailsTony Young
Randy Phone #: ###-####,, walls ok
BLD-Framing/Rough-in9/26/20169/27/20169/27/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, straps ok,, fire caulking ok,, still need other items
BLD-Framing/Rough-in9/22/20169/26/20169/26/2016APART
DetailsTony Young
Dusty Phone #: ###-####,, walk through,, ok to insulate walls,, NEED.. tempered glass,, finish fire caulking,, stairs per code,, justify shed roof venting,, backing for hand rails,, strap top plates, etc
BLD-Framing/Rough-in9/16/20169/19/20169/19/2016ANR
DetailsTony Young
Dusty Phone #: ###-####,, ?s on cut outs,, ok if per engineering,, ?s about chases
BLD-Framing/Rough-in9/12/20169/13/20169/13/2016ACANC
DetailsMike Jordan
Dusty Phone #: ###-####
BLD-Conference9/13/20169/13/20169/13/2016ADONE
DetailsMike Jordan
Dusty Phone #: ###-####
BLD-Framing/Rough-in8/30/20168/31/20168/31/2016APART
DetailsTony Young
Dusty Phone #: ###-####,, interior hold downs,, shear walls
BLD-Wall Bracing8/26/20168/29/20168/29/2016APART
DetailsTony Young
Shear // Dusty Phone #: ###-####,, upper drywall for drops in hall way ok
BLD-Wall Bracing8/24/20168/25/20168/25/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, exterior wall bracing/shear ok,, still will need interior
BLD-Framing/Rough-in8/19/20168/22/20168/22/2016ANR
DetailsTony Young
Dusty Phone #: ###-####,, on site walk through only
BLD-Footing7/8/20167/11/20167/11/2016PPART
DetailsTony Young
Dusty Phone #: ###-####,, footing ok pending special inspection report