Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD16-01525
StatusFinaled
Name Doug Wheeler
Site Address 1115 N CLOVERDALE RD
Project NameA New Storage Building (CSDA)
Customer Number 
ePlanReviewYes
Description
(SEVENTH DAY ADVENTIST - Storage Building) A new 3,200 s.f. storage building for the existing church on the same site. This building is not fire sprinklered and meets IECC definition of low energy building. Scope of work includes: construction of poured concrete foundation, construction of wood frame exterior walls, construction of a pre-manufactured roof truss system, [construction of partition walls to create: an accessible restroom and 7 distinct rooms utilized by different church affiliated organizations], new plumbing, new electrical, new interior finishes, new exterior finishes, and related site work. NOTE: a separate racking permit is required if racking exceeds 8 feet in hieght. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/11/201710/12/201710/12/2017PPASS
DetailsMike Jordan
Doug Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection8/23/20178/24/20178/24/2017APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/18/20178/18/20178/18/2017PFAIL
DetailsTroy Cobbley
Provide single action hardware for the interior doors, provide tagged/mounted fire entinguishers as discussed and marked on the plans. Provide fire dept. signage as discussed.

Doug Phone #: ###-####
BLD-Final8/16/20178/18/20178/18/2017ANR
DetailsMike Jordan
Doug or ###-####-please call whgen on way Phone #: ###-####. Needs fire/life/safety, zoning and public works finals first. Caleed and notified Doug.
BLD-Framing/Rough-in1/17/20171/17/20171/17/2017PPASS
DetailsMike Jordan
Call 45 mintues to meet // Doug Phone #: ###-####. All issues resolved. ok to sheet rock.
BLD-Energy code compliance1/17/20171/17/20171/17/2017PPASS
DetailsMike Jordan
Call 45 mintues to meet // Doug Phone #: ###-####
BLD-Framing/Rough-in12/28/201612/28/201612/28/2016PPART
DetailsMike Jordan
Doug// please call ahead Phone #: ###-####. Instaal the missing h2.5's. Instaal the draft stop. Ok to insulate.
BLD-Framing/Rough-in9/20/20169/21/20169/21/2016PCANC
DetailsMike Jordan
Doug Phone #: ###-####
BLD-Wall Bracing9/21/20169/21/20169/21/2016PPASS
DetailsMike Jordan
Doug Phone #: ###-####. Interior wall bracing and remainder of exterior. ok to cover exteior.
BLD-Framing/Rough-in9/7/20169/8/20169/8/2016ACANC
DetailsMike Jordan
doug Phone #: ###-####
BLD-Wall Bracing9/8/20169/8/20169/8/2016APASS
DetailsMike Jordan
doug Phone #: ###-####
BLD-Foundation8/1/20168/2/20168/2/2016PPASS
DetailsMike Jordan
Shawn Phone #: ###-####
BLD-Footing7/29/20168/1/20168/1/2016PPASS
DetailsMike Jordan
Phone #: ###-####
BLD-Conference7/25/20167/26/20167/26/2016ADONE
DetailsMike Jordan
Reviewed footing and foundation plan and awnsered questions regarding interior column pad footings and thickend slab footings.