Information based on query as of Thursday, June 27, 2024.
Permit Information
Permit NumberBLD16-01713
StatusFinaled
Name RMH COMPANY
Site Address 1101 W RIVER ST
Project NameGolden Eagle - Rstrm/Lobby
Customer Number 
ePlanReviewYes
Description
(GOLDEN EAGLE BUILDING - FORREST RIVER VIII – RESTROOM/LOBBY REMODEL) Permit is to remodel the main floor lobby area and the core restrooms on all three stories within the 42,673 sq. ft. existing three story building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: @ 1st floor new ADA Hi/Lo accessible drinking fountain, modify toilet compartments to add an ADA wheelchair accessible water closet, modify millwork, new wall covering at lobby, electrical work, plumbing work; @ 2nd floor new ADA Hi/Lo accessible drinking fountain, modify door swing at ADA wheelchair accessible water closet, electrical work, plumbing work; @ 3rd floor new ADA Hi/Lo accessible drinking fountain, modify toilet compartments to add an ADA wheelchair accessible water closet, modify millwork, electrical work, plumbing work. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/31/20169/1/20169/1/2016PPASS
DetailsDave Hannah
Doug Phone #: ###-####
DOC - Permit Finaled9/1/20169/1/20169/1/2016PPASS
DetailsDave Hannah
FIRE-Final Inspection8/31/20169/1/20169/1/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, no modifications to fire alarm system, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Final6/7/20166/8/20166/8/2016PNR
DetailsTony Young
Doug Phone #: ###-####
FIRE-Final Inspection6/7/20166/8/20166/8/2016APART
DetailsJim Page
Project being worked in phases, phase 1 (Level 3 lobby/restrooms) restrooms are comlete, exit signs were being replaced at time of inspection, will verify exit sign placement during inspection for level 2. Fire sprinklers complete for level 3, no fire alarm modifications, fire extinguisher in place with current inspection tag. Final life fire safety inspection complete for level 3.
BLD-Framing/Rough-in5/24/20165/24/20165/25/2016PPART
DetailsDave Hannah
Doug Phone #: ###-#### third floor ok to cover lobby ceilings