BLD-Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | CANC |
Jim Sly
|
|
|
Colby Phone #: ###-#### need zoning
|
FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of evacution guides as discussed, provide closers on exterior doors, provide 3' minimum clearance from smoke alarms to bathroom doors with tub or shower.
|
BLD-Energy code compliance | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Jim Sly
|
|
|
south end; Colby Phone #: ###-####
|
BLD-Energy code compliance | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PART |
Jim Sly
|
|
|
Colby Phone #: ###-#### N 1/2 f
|
BLD-Framing/Rough-in | 3/31/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Other | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Jim Sly
|
|
|
fire caulking; Colby Phone #: ###-####
|
BLD-Framing/Rough-in | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Wall Bracing | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PASS |
Jim Sly
|
|
|
Shear // Colby Phone #: ###-####
|
BLD-Wall Bracing | 2/15/2017 | 2/16/2017 | 2/16/2017 | P | PART |
Jim Sly
|
|
|
partial shear on breezeways-Colby Phone #: ###-#### Breezways only.....OK.
|
BLD-Foundation | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PASS |
Jim Sly
|
|
|
Rebar // Colby Phone #: ###-####
|
BLD-Footing | 11/15/2016 | 11/16/2016 | 11/16/2016 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Foundation | 11/7/2016 | 11/8/2016 | 11/8/2016 | P | CANC |
Jim Sly
|
|
|
Colby Phone #: ###-#### Ridgid insulation at foundation....OK.
|
BLD-Foundation | 11/3/2016 | 11/4/2016 | 11/7/2016 | P | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 11/2/2016 | 11/3/2016 | 11/3/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|