BLD-Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | CANC |
Jim Sly
|
|
|
Colby Phone #: ###-#### need zoning
|
FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of evacution guides as discussed, provide closers on exterior doors, provide 3' minimum clearance from smoke alarms to bathroom doors with tub or shower.
|
BLD-Energy code compliance | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | PASS |
Jim Sly
|
|
|
West-End ONLY; Colby Phone #: ###-#### All energy code....passed.
|
BLD-Energy code compliance | 3/15/2017 | 3/16/2017 | 3/16/2017 | A | PART |
Jim Sly
|
|
|
Colby Phone #: ###-#### East 1/2 f
|
BLD-Framing/Rough-in | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PASS |
Jim Sly
|
|
|
Colby partial framing Phone #: ###-####
|
BLD-Conference | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | DONE |
Jim Sly
|
|
|
Colby Phone #: ###-#### Discussed Firestopping with Colby.
|
BLD-Conference | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | DONE |
Mike Jordan
|
|
|
Colby Phone #: ###-####. Went over firestoping.
|
BLD-Wall Bracing | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Jim Sly
|
|
|
colby Phone #: ###-####
|
BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PART |
Jim Sly
|
|
|
Breez way shear // Colby Phone #: ###-#### Breezway at E. and W. ends.....OK
|
BLD-Wall Bracing | 2/1/2017 | 2/2/2017 | 2/2/2017 | P | NR |
Jim Storey
|
|
|
Shear // Colby Phone #: ###-#### missing blk. over drinen as well as un nailed
|
BLD-Conference | 12/19/2016 | 12/20/2016 | 12/20/2016 | A | DONE |
Jim Sly
|
|
|
colby Phone #: ###-#### Met with Colby and Mech Contractor.
|
BLD-Footing | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Jim Sly
|
|
|
Colby this is ready for the Am If possible Phone #: ###-####
|
BLD-Foundation | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | PART |
Jim Sly
|
|
|
Colby Phone #: ###-#### Ridgid Foam OK.
|
BLD-Foundation | 10/28/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|