BLD-Final | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | CANC |
Jim Sly
|
|
|
Colby Phone #: ###-#### need zoning
|
FIRE-Final Inspection | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of evacution guides as discussed, provide closers on exterior doors, provide 3' minimum clearance from smoke alarms to bathroom doors with tub or shower.
|
BLD-Energy code compliance | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Jim Sly
|
|
|
south side - Colby Phone #: ###-####
|
BLD-Energy code compliance | 4/12/2017 | 4/13/2017 | 4/13/2017 | A | PART |
Jim Sly
|
|
|
Colby Phone #: ###-####-north end of building only North end only....OK.
|
BLD-Framing/Rough-in | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Framing/Rough-in | 3/22/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-####
|
BLD-Framing/Rough-in | 2/24/2017 | 2/24/2017 | 2/24/2017 | P | PART |
Jim Sly
|
|
|
Colby would like a shear inspection. Phone #: ###-#### Wall Bracing ...OK
|
BLD-Wall Bracing | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PART |
Jim Sly
|
|
|
Colby-partial shear on breezeways only Phone #: ###-#### OK
|
BLD-Other | 11/16/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Jim Sly
|
|
|
colby - underslab rebar Phone #: ###-####
|
BLD-Foundation | 11/9/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Jim Sly
|
|
|
colby Phone #: ###-#### Interior footings....OK.
|
BLD-Foundation | 11/7/2016 | 11/8/2016 | 11/8/2016 | P | NR |
Jim Sly
|
|
|
Colby Phone #: ###-####
|
BLD-Foundation | 11/1/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 10/31/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Jim Sly
|
|
|
Dane Phone #: ###-####
|