BLD-Final | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 10/5/2017 | 10/5/2017 | 10/5/2017 | | PART |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Aging Inspection | 10/4/2017 | 10/4/2017 | 10/5/2017 | | DEFR |
Brandon Shaw
|
|
|
|
BLD-Wall cover | 5/23/2017 | 5/23/2017 | 5/23/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin-interior shear wall Phone #: ###-####
|
BLD-Energy code compliance | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Shear // Justin Phone #: ###-####
|
BLD-Aging Inspection | 5/3/2017 | 5/3/2017 | 5/10/2017 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Foundation | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Brandon Shaw
|
|
|
Justin Phone #: ###-#### Conference with builder, all remaining hold downs in place, foundation (mud room/kitchen area) was poured in phases. Last phase was poured without inspection. OK to call for wall bracing inspection.
|
BLD-Foundation | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | NR |
Dave Hannah
|
|
|
Pat Phone #: ###-#### weather to cold and forms are frozen
|
BLD-Foundation | 1/17/2017 | 1/17/2017 | 1/18/2017 | P | CANC |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | CANC |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
Extend Permit 90/180 days | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Jim Storey
|
|
|
ok as noted
|
BLD-Footing | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PART |
Jim Storey
|
|
|
Pat Phone #: ###-#### rebar in place apears ground is foozen 25 deg. 3;45 pm with blankes
|
BLD-Footing | 12/15/2016 | 12/16/2016 | 12/16/2016 | P | FAIL |
Phil Shearer
|
|
|
Jose Phone #: ###-####. Average daily temp below 20 deg.
|
BLD-Footing | 12/15/2016 | 12/15/2016 | 12/15/2016 | P | NR |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | NR |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Phil Shearer
|
|
|
Foundation walls
|
BLD-Foundation | 10/27/2016 | 10/27/2016 | 10/27/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | NR |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|