BLD-Final | 2/22/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
DOC - Permit Finaled | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Per Home owner and Ron Johnson, Division Chief- Assistant Fire Marshal
Updated fire safety plan is approved, no sprinkler system required.
|
BLD-Aging Inspection | 1/26/2018 | 1/26/2018 | 1/26/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/26/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Energy code compliance | 9/11/2017 | 9/13/2017 | 9/13/2017 | A | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 9/11/2017 | 9/11/2017 | 9/11/2017 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2017 | 9/6/2017 | 9/6/2017 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, need fire blocks, fire place rough in,, truss engineering ,, ok to insulate
|
BLD-Framing/Rough-in | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
BLD-Wall Bracing | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, exterior ok
|
BLD-Framing/Rough-in | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | NR |
Tony Young
|
|
|
Scott Phone #: ###-####,, need trades,, walk through conf only
|
BLD-Aging Inspection | 3/10/2017 | 3/10/2017 | 3/14/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/9/2017 | 3/9/2017 | 3/10/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 10/25/2016 | 10/26/2016 | 10/26/2016 | A | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, special inspection on all work,, poured,, also pending letter on continuous footing
|
BLD-Footing | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | DEFR |
Tony Young
|
|
|
Scott Phone #: ###-####
|
BLD-Foundation | 10/24/2016 | 10/25/2016 | 10/25/2016 | P | NR |
Dave Hannah
|
|
|
Rebar // Scott Phone #: ###-####
|
BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 | P | NR |
Dave Hannah
|
|
|
Scott Phone #: ###-####
|
BLD-Footing | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | NR |
Mike Jordan
|
|
|
Scott-would like as early as possible Phone #: ###-####-please call when on way so Scott can meet. Needs 3 inches of clearance from ground, verts needs to be tied in place, lower footings to be continous and step down. Contractor to have engineer provide details for transition of ICF from lower to upper footings and for step footings.
|