BLD-Final | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
DOC - Permit Finaled | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Jim Storey
|
|
|
Please call 20 min before. Builder would like to be present. Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Conference | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | CANC |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | FAIL |
Mike Jordan
|
|
|
Andy Phone #: ###-####. Strap cassita beam, roll block A2 trusses, provide tempered glazing at windows either side of door at upstairs master, provide hangar on 2nd. floor floor joist. Correction notice posted. Ok to insulate.
|
BLD-Conference | 9/18/2016 | 9/19/2016 | 9/19/2016 | A | CANC |
Mike Jordan
|
|
|
Call me if it isn''t "ready" Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Framing/Rough-in | 9/18/2016 | 9/19/2016 | 9/19/2016 | A | FAIL |
Mike Jordan
|
|
|
If you say it''s NR again I''ll be pisssed off and make a huge stink. I''ve already talked to mechanical and the super about it. Please contact me and say the word "rainbows" so I know you actually read this crap. Phone #: ###-#### Inspection requested via web by Andy Thompson. Needs airseal pack completed prior to framing inspection. Airseal was not completed on friday when I came by and is still not done.
|
BLD-Framing/Rough-in | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. Needs to complete airseal pack prior to framing inspection.
|
BLD-Framing/Rough-in | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | NR |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson. Need to pass mechanical rough in
|
BLD-Wall Bracing | 9/5/2016 | 9/6/2016 | 9/6/2016 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson
|
BLD-Energy code compliance | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####
|
BLD-Foundation | 7/28/2016 | 7/28/2016 | 7/28/2016 | P | PASS |
Mike Jordan
|
|
|
Derick Phone #: ###-####
|
BLD-Footing | 7/26/2016 | 7/27/2016 | 7/27/2016 | P | FAIL |
Mike Jordan
|
|
|
Chris Phone #: ###-####. No approved plans on site.
|