Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD16-02362
StatusFinaled
Name ANDY THOMPSON CONSTRUCTION INC
Site Address 1343 N ETHRIDGE LN
Project Name#3300
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 1830 sq. ft., two story (first story 1340 sq. ft., second story 590 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 28 sq. ft. of covered porch and a 590 sq. ft. attached garage per the approved plans, ACCA report, and any notations. R-1B zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/1/201612/2/201612/2/2016APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson
DOC - Permit Finaled12/2/201612/2/201612/2/2016PPASS
DetailsMike Jordan
BLD-Energy code compliance9/23/20169/23/20169/23/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Framing/Rough-in9/23/20169/23/20169/23/2016PPASS
DetailsJim Storey
Please call 20 min before. Builder would like to be present. Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Conference9/20/20169/20/20169/20/2016PCANC
DetailsMike Jordan
Andy Phone #: ###-####
BLD-Framing/Rough-in9/20/20169/20/20169/20/2016PFAIL
DetailsMike Jordan
Andy Phone #: ###-####. Strap cassita beam, roll block A2 trusses, provide tempered glazing at windows either side of door at upstairs master, provide hangar on 2nd. floor floor joist. Correction notice posted. Ok to insulate.
BLD-Conference9/18/20169/19/20169/19/2016ACANC
DetailsMike Jordan
Call me if it isn''t "ready" Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Framing/Rough-in9/18/20169/19/20169/19/2016AFAIL
DetailsMike Jordan
If you say it''s NR again I''ll be pisssed off and make a huge stink. I''ve already talked to mechanical and the super about it. Please contact me and say the word "rainbows" so I know you actually read this crap. Phone #: ###-#### Inspection requested via web by Andy Thompson. Needs airseal pack completed prior to framing inspection. Airseal was not completed on friday when I came by and is still not done.
BLD-Framing/Rough-in9/16/20169/16/20169/16/2016PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson. Needs to complete airseal pack prior to framing inspection.
BLD-Framing/Rough-in9/14/20169/15/20169/15/2016ANR
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Andy Thompson. Need to pass mechanical rough in
BLD-Wall Bracing9/5/20169/6/20169/6/2016APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Andy Thompson
BLD-Energy code compliance8/2/20168/3/20168/3/2016APASS
DetailsMike Jordan
Andy Phone #: ###-####
BLD-Foundation7/28/20167/28/20167/28/2016PPASS
DetailsMike Jordan
Derick Phone #: ###-####
BLD-Footing7/26/20167/27/20167/27/2016PFAIL
DetailsMike Jordan
Chris Phone #: ###-####. No approved plans on site.