BLD-Final | 1/31/2020 | 2/3/2020 | 2/3/2020 | A | PASS |
Brandon Shaw
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 2/3/2020 | 2/3/2020 | 2/3/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 11/26/2019 | 11/27/2019 | 11/27/2019 | A | FAIL |
Brandon Shaw
|
|
|
Address to be visible from the street... Handrail continuity- 3rd floor stairs to be as per R311.7.8.2.. 3rd floor, deck stairs/landing to grade to be at least 3'x3' and no more that 7 3/4" rise...
|
BLD-Conference | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Tony Young
|
|
|
Cleve- please call 45 mins before Phone #: ###-####..?s on final
|
BLD-Aging Inspection | 1/11/2019 | 1/11/2019 | 1/15/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Tony Young
|
|
|
Kevin Phone #: ###-####,, ok to insulate,, needs one more sprinkler inspection prior to cover
|
BLD-Wall Bracing | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Brandon Shaw
|
|
|
Kevin-exterior wall Phone #: ###-####
|
BLD-Wall Bracing | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | NR |
Tony Young
|
|
|
exterior shear // Kevin Phone #: ###-####
|
BLD-Other | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | PEND |
Tony Young
|
|
|
Kevin-CMU walls Phone #: ###-####,, needs structural engineer approval
|
BLD-Other | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | DEFR |
Jim Storey
|
|
|
Kevin-CMU walls Phone #: ###-#### out of time
|
BLD-Foundation | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PART |
Tony Young
|
|
|
CMU walls - Kevin Phone #: ###-####,, 2nd pour,, work in progress,, 1st pour was not inspected by our dept.. need letter of approval from the engineer for the 1st grout pour
|
BLD-Foundation | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PART |
Dave Hannah
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 10/10/2017 | 10/11/2017 | 10/11/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, wip
|
BLD-Foundation | 9/27/2017 | 9/27/2017 | 9/27/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 9/18/2017 | 9/18/2017 | 9/18/2017 | P | PART |
Brandon Shaw
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 9/13/2017 | 9/14/2017 | 9/14/2017 | P | NR |
Dave Hannah
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 8/30/2017 | 8/31/2017 | 8/31/2017 | A | PART |
Tony Young
|
|
|
late am // Mana Phone #: ###-####,, work in progress
|
BLD-Footing | 8/28/2017 | 8/29/2017 | 8/29/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, ok per soils area
|
BLD-Foundation | 8/11/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Dave Hannah
|
|
|
Wall // Mana Phone #: ###-####
|
BLD-Footing | 8/10/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 8/4/2017 | 8/4/2017 | 8/4/2017 | P | PART |
Brandon Shaw
|
|
|
Mana Phone #: ###-####
|
BLD-Foundation | 8/3/2017 | 8/3/2017 | 8/4/2017 | P | PART |
Brandon Shaw
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 7/20/2017 | 7/21/2017 | 7/21/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####
|
BLD-Footing | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, basement footings,, work in progress
|
BLD-Footing | 7/19/2017 | 7/20/2017 | 7/21/2017 | P | NR |
Tony Young
|
|
|
Mana Phone #: ###-####,, needs soils report for this area
|
BLD-Foundation | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PART |
Brandon Shaw
|
|
|
Mana Phone #: ###-#### Lower foundation wall, OK Work in progress
|
BLD-Footing | 6/15/2017 | 6/16/2017 | 6/16/2017 | P | PART |
Tony Young
|
|
|
Mana Phone #: ###-####,, lower ftg ok,, work in progress
|
BLD-Foundation | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PART |
Tony Young
|
|
|
Wall // Mana Phone #: ###-####,, upper retaining footing and wall ok
|
BLD-Footing | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | NR |
Tony Young
|
|
|
Mana Phone #: ###-####,, needs soils approval
|
BLD-Footing | 5/3/2017 | 5/4/2017 | 5/4/2017 | P | NR |
Tony Young
|
|
|
Mana Phone #: ###-####,, needs soils report
|