Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-02628
StatusFinaled
Name MOUNTAIN WEST IRA INC FBO KELLY J
Site Address 725 E JEFFERSON ST
Project Name 
Customer NumberDRH16-00223
ePlanReviewNo
Description
***PLAN MODIFICATION 4-18-17 - Add a 6'x20' deck to the rear of the existing home. All work to be done according to plans, notes and review notes and Historic approval as per TLV. **BJM** DRH16-00223; **9/13/16 plan modification to extend rear footprint 4 feet (60 sq.ft), reconfigure master bedroom/bathroom on main level.//leg **8/5/16 plan modification to include full scope of work for project, to construct 300 sq. ft. main level addition, and add 800 sq. ft. second story over exiting dwelling, and new 120 sq. ft. front porch. Scope also includes interior remodel of existing dwelling which will be total 4 bedrooms, 2.5 bathrooms. Separate electrical, plumbing and mechanical permits are required. The second level will be heated with ductless system. All work is to be done according to approved plans, Plan Review Report, engineering, current local codes, and as approved under Certificate of Appropriateness (DRH16-00223).//leg **Permit for first phase scope of work to reinforce existing foundation of single family dwelling in historical district with rubble foundation to prepare for second story and main level addition. Demolition of dwelling walls or roof is NOT included in this phase. Separate erosion permit is required. All work is to be done according to approved plan, engineers letter and current local codes. //leg
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20178/22/20178/22/2017PPASS
DetailsDave Hannah
Kyle Phone #: ###-####
DOC - Permit Finaled8/22/20178/22/20178/22/2017PPASS
DetailsDave Hannah
BLD-Final8/17/20178/17/20178/17/2017PPEND
DetailsDave Hannah
Kelly Phone #: ###-#### needs zoning final
BLD-Conference4/24/20174/24/20174/24/2017PDONE
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Energy code compliance12/16/201612/16/201612/16/2016PPASS
DetailsJim Sly
Kelly Phone #: ###-####
BLD-Framing/Rough-in12/9/201612/12/201612/12/2016PPASS
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Framing/Rough-in12/9/201612/9/201612/12/2016PNR
DetailsDave Hannah
Kelly Phone #: ###-####
BLD-Wall Bracing10/19/201610/19/201610/20/2016PPASS
DetailsDave Hannah
Shear // Kelly Phone #: ###-####
BLD-Foundation9/19/20169/20/20169/21/2016APASS
DetailsDave Hannah
Requests 11AM, pouring at 1 - Dave Phone #: ###-####
BLD-Foundation9/16/20169/19/20169/19/2016ACANC
DetailsDave Hannah
Dave Phone #: ###-####
BLD-Footing9/19/20169/19/20169/19/2016APASS
DetailsDave Hannah
BLD-Conference9/12/20169/12/20169/13/2016PPEND
DetailsDave Hannah
would like call ahead; Kelly Phone #: ###-####
BLD-Foundation7/25/20167/25/20167/25/2016PPASS
DetailsPhil Shearer
Kelly Phone #: ###-####
BLD-Footing7/20/20167/20/20167/20/2016PPART
DetailsDave Hannah
Kelly Phone #: ###-#### first three sections