FIRE-Final Inspection | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 4/6/2017 | 4/7/2017 | 4/6/2017 | A | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
FIRE-Final Inspection | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need city approved drawings and small documents, needs address facing street, need riser room to be one hour rated, needs smoke alarms relocated to more than 3' from bathroom doors.
|
BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PASS |
Mike Jordan
|
|
|
Sheet rock // Pat Phone #: ###-####
|
BLD-Energy code compliance | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | FAIL |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Fireblock all concealed areas at 1st. floor ceiling. Complete airseal, roll block all cantilevered floor joist, provide truss engineering, Box out the elctrical service panels with 2 layers of 5/8 type x rock. ok to insualte. Corection notice issued. ok to insulate.
|
BLD-Wall Bracing | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 10/5/2016 | 10/6/2016 | 10/6/2016 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 10/4/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 10/3/2016 | 10/4/2016 | 10/4/2016 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|