BLD-Final | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PEND |
Mike Jordan
|
|
|
Pat Phone #: ###-####. everything ok. Needs zoing sign of.
|
FIRE-Final Inspection | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request for life fire safey, this inspection request is cancelled.
|
FIRE-Final Inspection | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place. Final life fire safety inspection passed/complete.
|
BLD-Other | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Mike Jordan
|
|
|
RC1 Channel - suite''s 103 & 104; Pat Phone #: ###-####
|
BLD-Other | 4/25/2017 | 4/26/2017 | 4/26/2017 | A | PASS |
Mike Jordan
|
|
|
Pat-RC1 Phone #: ###-####
|
BLD-Energy code compliance | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Jim Sly
|
|
|
103, 104, 203 and 204 // Pat Phone #: ###-####
|
BLD-Wall Bracing | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Jim Sly
|
|
|
RC1 CHANNEL 101 // Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | NR |
Mike Jordan
|
|
|
Units 103,104, 203 & 204 only - Pat Phone #: ###-####. Needs to fire caulk toilets and wires in attic. No fire sprinkler rough in has been done in these units nor has one beed scheduled. No cover at this time.
|
BLD-Energy code compliance | 4/12/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Mike Jordan
|
|
|
Jeremy--ste 101, 101, 201 & 202 Phone #: ###-####
|
FIRE-Supply Line Hydro | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | CANC |
Troy Cobbley
|
|
|
pat Phone #: ###-####
|
BLD-Wall Bracing | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | CANC |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | CANC |
Mike Jordan
|
|
|
Pat-ste #101, 102, 201 & 202 Phone #: ###-####
|
BLD-Framing/Rough-in | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PART |
Mike Jordan
|
|
|
Units 101,102,201and 202 ok pending fire sprinkler.
|
BLD-Wall Bracing | 4/12/2017 | 4/12/2017 | 4/12/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Wall Bracing | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | NR |
Mike Jordan
|
|
|
Pat Phone #: ###-####. No one on site. Could not locate approved set of plans. No inspection.
|
BLD-Framing/Rough-in | 1/11/2017 | 1/12/2017 | 1/12/2017 | A | CANC |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 12/8/2016 | 12/9/2016 | 12/9/2016 | A | PASS |
Mike Jordan
|
|
|
Dane// late am Phone #: ###-####
|
BLD-Foundation | 12/7/2016 | 12/8/2016 | 12/8/2016 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####. PLacement has been cancelled for today. Fottings and stemwall covered with concrete blankets when I arrived on site.
|
BLD-Footing | 12/6/2016 | 12/7/2016 | 12/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 12/2/2016 | 12/5/2016 | 12/5/2016 | P | PASS |
Mike Jordan
|
|
|
dane Phone #: ###-####
|