Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD16-02674
StatusFinaled
Name MARCUM HOMES LLC
Site Address 3345 E PARSNIP PEAK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan mod 10/10/16 to remove the portal frame and change some headers located at the rear of the home. DAF** WUI Zone B, a class "A" roof covering is required. Permit for the construction of a new 2099 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 254 sq. ft. of covered patio/porch and a 809 sq. ft. attached garage per the approved plans, and any notations. C-4D/DA zoning and setbacks per planning. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/201612/16/201612/16/2016APASS
DetailsPhil Shearer
Dirk// please call for access Phone #: ###-####
DOC - Permit Finaled12/16/201612/16/201612/16/2016PPASS
DetailsPhil Shearer
BLD-Energy code compliance10/6/201610/7/201610/10/2016APASS
DetailsPhil Shearer
Dirk Phone #: ###-####
BLD-Framing/Rough-in10/10/201610/10/201610/10/2016PPASS
DetailsPhil Shearer
Dirk Phone #: ###-####
BLD-Framing/Rough-in10/3/201610/4/201610/4/2016PPART
DetailsPhil Shearer
Dirk Phone #: ###-####. Portal frame headers in great room and door to patio need to be
(2) 2x12 as per plan. OK to insulate
BLD-Wall Bracing9/20/20169/21/20169/21/2016PPART
DetailsPhil Shearer
Derick Phone #: ###-####. Missing hold downs. OK to wrap
BLD-Foundation8/15/20168/16/20168/16/2016PPASS
DetailsPhil Shearer
Dane Phone #: ###-####
BLD-Foundation8/12/20168/15/20168/15/2016PPASS
DetailsPhil Shearer
Dane Phone #: ###-####
BLD-Footing8/11/20168/12/20168/12/2016PPASS
DetailsDave Hannah
Jerry Phone #: ###-####