BLD-Final | 4/10/2017 | 4/10/2017 | 4/10/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
DOC - Permit Finaled | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 2/14/2017 | 2/15/2017 | 2/16/2017 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Framing/Rough-in | 2/14/2017 | 2/14/2017 | 2/14/2017 | P | FAIL |
Mike Jordan
|
|
|
Joey: ###-####.B15 and B16 trusses. OK to insualte. Correction notice posted.
|
BLD-Framing/Rough-in | 2/14/2017 | 2/14/2017 | 2/14/2017 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart. Needs plumbing rough in inspection.
|
BLD-Framing/Rough-in | 2/10/2017 | 2/13/2017 | 2/13/2017 | A | NR |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart,, needs plumbing pass 1st,, do not insulate
|
BLD-Wall Bracing | 2/9/2017 | 2/9/2017 | 2/10/2017 | P | PASS |
Jim Sly
|
|
|
Guillermo Phone #: ###-####
|
BLD-Wall Bracing | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | FAIL |
Dave Hannah
|
|
|
guillermo Phone #: ###-#### needs to install floor to floor strapes
|
BLD-Wall Bracing | 2/1/2017 | 2/2/2017 | 2/2/2017 | A | PASS |
Dave Hannah
|
|
|
Rudy Phone #: ###-####
|