BLD-Final | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Mike Jordan
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 12/14/2016 | 12/15/2016 | 12/15/2016 | P | PASS |
Mike Jordan
|
|
|
Insulation // Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 12/14/2016 | 12/15/2016 | 12/15/2016 | A | PASS |
Mike Jordan
|
|
|
Joel Phone #: ###-####
|
BLD-Framing/Rough-in | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | CANC |
Mike Jordan
|
|
|
joel Phone #: ###-####
|
BLD-Conference | 12/14/2016 | 12/14/2016 | 12/14/2016 | A | DONE |
Mike Jordan
|
|
|
joel Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | FAIL |
Mike Jordan
|
|
|
joel Phone #: ###-####. Complete lateral bracing on G3 truss. Provide continous bearingon G6 truss as shown on the truss engineering. Complete the fullheight blocking at B1,B2 and B3 areas as shown on the engineering. Install all straps on drag trusses as shown on engineering. Fasten gable to shear wall as shown on engineering. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 12/12/2016 | 12/12/2016 | 12/12/2016 | P | FAIL |
Mike Jordan
|
|
|
joel Phone #: ###-####. Provide the truss enginnering and the additional enginnering. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Mike Jordan
|
|
|
Brett Phone #: ###-####
|
BLD-Footing | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Mike Jordan
|
|
|
slab on grade, interior footing - Joel Phone #: ###-####
|
BLD-Foundation | 11/4/2016 | 11/7/2016 | 11/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 11/3/2016 | 11/4/2016 | 11/4/2016 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|