BLD-Final | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Jim Sly
|
|
|
Jim Stewart Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PART |
Jim Sly
|
|
|
Jim Phone #: ###-#### OK for Temp. Occ. OK for Perm Occ. when Public Works signs Perm.
|
FIRE-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/25/2017 | 4/27/2017 | 4/28/2017 | A | NR |
Jim Sly
|
|
|
Jim-as early as possible Phone #: ###-####
|
FIRE-Final Inspection | 4/27/2017 | 4/27/2017 | 4/27/2017 | P | FAIL |
Troy Cobbley
|
|
|
repair the two exit discharge lights at the main exit
|
FIRE-Final Inspection | 4/25/2017 | 4/26/2017 | 4/26/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide small documents, provide fire dept approval of tanks and pumps, repair main exit discharge light and corridor emergency light, remove deadbolt from beer cooler, remove thumbturn deadbolt (keyed ok) from main exit and provide indicator and sticker, install address, test the emergency fuel shut offs
|
BLD-Other | 3/21/2017 | 3/22/2017 | 3/23/2017 | P | PASS |
Jim Sly
|
|
|
Vapor Barrier - Jim Phone #: ###-#### Exterior Weatherproof Barrier.....OK
|
BLD-Wall Bracing | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PART |
Jim Sly
|
|
|
First thing, please for sheetrock - Jim Phone #: ###-#### 2 layers Rock installed on ceiling above where cooler will be installed.
|
BLD-Wall Bracing | 3/3/2017 | 3/9/2017 | 3/8/2017 | P | PART |
Jim Sly
|
|
|
Jim//shear wall nailing insp Phone #: ###-#### Interior.....West wall behind coolers....OK.
|
BLD-Energy code compliance | 3/3/2017 | 3/8/2017 | 3/7/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/3/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Jim Sly
|
|
|
Jim Phone #: ###-#### West wall ...OK to Insulate and install wood shear panels. If all trades approve.
|
BLD-Framing/Rough-in | 3/3/2017 | 3/6/2017 | 3/6/2017 | A | PART |
Jim Sly
|
|
|
Roof sheating//Jim would like first thing AM if possible Phone #: ###-####
|
BLD-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Concrete | 2/16/2017 | 2/16/2017 | 2/16/2017 | A | PART |
Mike Jordan
|
|
|
As early as possible Phone #: 8013674060 >> Inspection requested via mobile web by Jim Slab on Grade Floor
|
BLD-Foundation | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PART |
Jim Sly
|
|
|
As late as possible Phone #: 8013674060 >> Inspection requested via mobile web by Jim Stewart Trash Enclosure. OK pending STRATA special inspection, tests and approvals.
|
BLD-Framing/Rough-in | 2/10/2017 | 2/13/2017 | 2/13/2017 | A | PART |
Jim Sly
|
|
|
Jim-wants a partial on exterior walls Phone #: ###-#### OK to sheet......Need to see Exterior walls prior to cover (exterior).
|
BLD-Footing | 2/10/2017 | 2/13/2017 | 2/13/2017 | A | PART |
Jim Sly
|
|
|
Jim-footings and piers-late am if possible Phone #: ###-#### OK pending STRATA special inspection tests and approvals.
|
BLD-Foundation | 2/6/2017 | 2/7/2017 | 2/9/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Foundation | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PART |
Jim Sly
|
|
|
would like at noon; Jim Phone #: ###-#### Foundation wall OK pending STRATA special inspection, tests and approval.
|