BLD-Energy code compliance | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PART |
Dave Hannah
|
|
|
Eric Phone #: ###-#### draft stopping ok but st?l needs to finish insulation
|
BLD-Framing/Rough-in | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2017 | 2/28/2017 | 2/28/2017 | A | PART |
Dave Hannah
|
|
|
Eric; Phone #: ###-#### letter from struc engineer oking hold downs ext ok crew roll blocking and installing draft stops
|
BLD-Conference | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PART |
Tony Young
|
|
|
Eric; Phone #: ###-####,, progress inspection on hold downs from new engineering,, need plan review ok,, will have engineer verify as built also
|
BLD-Conference | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | DEFR |
Tony Young
|
|
|
Eric; Phone #: ###-####,, pm
|
BLD-Conference | 2/17/2017 | 2/17/2017 | 2/17/2017 | A | NH |
Tony Young
|
|
|
eric
|
BLD-Aging Inspection | 2/10/2017 | 2/10/2017 | 2/14/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 1/30/2017 | 1/31/2017 | 1/31/2017 | A | PEND |
Dave Hannah
|
|
|
Eric late AM (office ###-####) Phone #: ###-#### needs mec rough in engineering on shear and hold downs house was lifted thin set back down and no connection between house and foundation done also fire stoppind issues around walls in basement
|
BLD-Foundation | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PART |
Tony Young
|
|
|
Luke,, rebar ok on poured footings
|
BLD-Footing | 9/27/2016 | 9/28/2016 | 9/28/2016 | P | PART |
Tony Young
|
|
|
Requests 2:30-3PM - Lucas Phone #: ###-####,, partial basement footings
|