Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD16-02861
StatusIssued
Name ANA MARIA ARANGO RODRIGUEZ
Site Address 3312 N CRANE CREEK RD
Project NameRodriguez remodel
Customer Number 
ePlanReviewNo
Description
WUI Zone A, Class "A" Roof Required** MODIFICATION - SCOPE CHANGING TO ALTER DECK SIZE/SHAPE AND DOWNSTAIRS WALL PLACEMENTS **jab** The scope of work is to repair basement exterior walls. Also, interior remodel of both the basement and the main level of the home. Replace existing roof system with hand stacked system, and construct a new 210 sq. ft. balcony on the back of the home. The work will be performed per the approved plans, attached engineering and local codes. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade and fill is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference10/31/201910/31/201910/31/2019PPART
DetailsTony Young
Ana Phone #: ###-####// ?s on getting a final.. needs exterior deck/landing or ?,, needs garage seperation,, handrail per code to basement
BLD-Aging Inspection3/28/20193/28/20193/29/2019 PEND
DetailsTony Young
BLD-Aging Inspection3/27/20193/27/20193/28/2019 PEND
DetailsTony Young
BLD-Aging Inspection11/9/201811/9/201811/13/2018 PASS
DetailsTony Young
BLD-Conference11/5/201811/5/201811/5/2018PPART
DetailsTony Young
Ana Phone #: ###-####,, ?s on final,, wants to get partial for upstairs,, needs life safey and trades ok 1st
BLD-Conference9/20/20189/21/20189/21/2018APASS
DetailsTony Young
Ana Phone #: ###-####,, general walk through,, ok
BLD-Conference8/2/20188/3/20188/3/2018APASS
DetailsTony Young
Ana Phone #: ###-####
BLD-Energy code compliance6/27/20186/28/20186/28/2018APASS
DetailsTony Young
Ana Phone #: ###-####
BLD-Wall cover6/27/20186/27/20186/27/2018PPART
DetailsTony Young
Ana Phone #: ###-####,, frame ok,, ok to insulate,, needs seal and fire blocking
BLD-Wall cover6/21/20186/22/20186/22/2018PPART
DetailsTony Young
Ana Phone #: ###-####,, ok to start insulation on unaffected walls,, and sheet with osb per engineering up stairs bedrooms
BLD-Framing/Rough-in6/13/20186/15/20186/15/2018PPART
DetailsTony Young
Michael Phone #: ###-####,, back 3 bedrooms on the main level ok to insulate,, other main floor walls without plumbing ok to insulate
BLD-Conference6/11/20186/12/20186/12/2018APEND
DetailsTony Young
Micheal Phone #: ###-####
BLD-Conference6/6/20186/7/20186/7/2018ADONE
DetailsDave Hannah
Ana Phone #: ###-####
BLD-Conference5/15/20185/16/20185/16/2018APASS
DetailsTony Young
Ana Phone #: ###-####,, walk through,, new owners,, need trades,, etc., has a structural engineer on board
BLD-Conference12/4/201712/5/201712/5/2017APART
DetailsTony Young
Jay Raulph walk through job; Phone #: ###-####,, need a detailed engineer report/fix,, ok to seal and back fill as needed,, ok to repour garage slab, front steps,, property will be put up for sale per Jay
BLD-Conference10/19/201710/24/201710/24/2017APEND
DetailsTony Young
late AM please // conference with owner''s rep. to go over project to see what status is. GC no longer on project // contact Jay Ralphs Phone #: ###-####
BLD-Conference10/23/201710/23/201710/23/2017APART
DetailsTony Young
late AM please // conference with owner''s rep. to go over project to see what status is. GC no longer on project // contact Jay Ralphs Phone #: ###-####,, met with a potential contractor to look at job
BLD-Footing7/18/20177/21/20177/21/2017PPART
DetailsTony Young
Tracy Phone #: ###-####,, interior footings for basement walls,, deck footings,, ok,
BLD-Footing7/17/20177/18/20177/18/2017APEND
DetailsTony Young
Tracy Phone #: ###-####,, need soils approval 1st
BLD-Footing7/17/20177/17/20177/17/2017PPEND
DetailsTony Young
Tracy Phone #: ###-####
BLD-Footing7/14/20177/17/20177/17/2017APEND
DetailsTony Young
Tracy Phone #: ###-####
BLD-Footing7/13/20177/14/20177/14/2017APEND
DetailsTony Young
Tracy Phone #: ###-####,, ok pending soils approval
BLD-Conference4/25/20175/3/20175/3/2017APASS
DetailsTony Young
Check status of project/scheduling. Express neighbors concerns.// status review,, work in progress ,, ok
BLD-Conference4/24/20174/25/20174/25/2017APART
DetailsTony Young
Check status of project/scheduling. Express neighbors concerns.,, talked with contractor.. Tracy.. he said that some good progress should be happening now... should start some footings next week..
BLD-Conference4/21/20174/24/20174/24/2017ANH
DetailsTony Young
Check status of project/scheduling. Express neighbors concerns.
BLD-Conference4/20/20174/21/20174/21/2017APEND
DetailsTony Young
Check status of project/scheduling. Express neighbors concerns.,, no one on site,, no apparent recent work.. will keep checking on progress