Permit NumberBLD16-03041
StatusFinaled
Name CM COMPANY
Site Address 1907 S BROADWAY AVE Unit: 203
Project NamePrimary Health Medical Group
Customer Number 
ePlanReviewYes
Description
**(PRIMARY HEALTH MEDICAL GROUP – 2ND STORY - SUITE #203)** Permit is to remodel an existing 1,930 sq. ft. medical office space and expand into adjacent existing tenant space to create a 4,033 sq. ft. medical office. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select exterior storefront windows for new door and window openings, removal of select exterior wall for new window opening, removal of select rated stairway wall for new door opening, removal of select interior nonbearing walls, removal of select interior door/door frames, removal of select millwork, removal of select light fixtures, removal of select suspended acoustic ceiling and gyp. ceiling, removal of select plumbing fixtures and accessories, construction of select interior nonbearing walls to create (7) exam rooms, a lab room, (3) offices, a storage room, an ADA accessible restroom, a reception area, a waiting area, a triage/vitals room, hallways and a break room, new door/door frames, new ADA Hi/Lo drinking fountain, new millwork, new select acoustic suspended ceiling and gyp. ceiling, new sinks, plumbing work, electrical work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building does not have a fire sprinkler system **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/6/20174/11/20174/11/2017PPASS
DetailsJim Storey
Use west stair well, go out on walk way second set of double door on your right. Phone #: ###-#### Inspection requested via web by Michael Schreiber
FIRE-Final Inspection4/6/20174/11/20174/11/2017APASS
DetailsJim Page
No fire sprinklers, no monitored fire alarms, fire extinguishers are in place with current inspection tags. Exit lights in the south corridor will be changed to double sided exit lights as shown on city approved drawings (exit lights in place but only one sided at time of inspection, double side will be completed before final building inspection). Final life fire safey inspection passed/complete.
BLD-Ceiling Grid Inspection3/16/20173/20/20173/20/2017APASS
DetailsJim Storey
Ceiling Grid inspection, second floor east end of the outside walkway. Come in the west stair well Phone #: ###-#### Inspection requested via web by Michael Schreiber
BLD-Framing/Rough-in1/31/20172/2/20172/2/2017APASS
DetailsJim Storey
Second floor east end, Suite 205 entrance, Wall framing for cover. Use west stair well, last door on the righ on the balcony. Phone #: ###-#### Inspection requested via web by Michael Schreiber
FIRE-Final Inspection1/5/20171/6/20171/6/2017APART
DetailsTroy Cobbley
Phase 1 life safety is complete/passed. However prior to a phase 2/final sign off the thumbturn dead bolt in the phase 1 area will need to be removed and the two remote annunciators for the duct smoke detectors will need to be repaired (shows no power) or approval from the mechanical engineer to remove the two duct detector/annunciators. Per the mechanical plans the cfm is well below the 2,000 limit.
BLD-Final1/4/20171/5/20171/5/2017PPASS
DetailsJim Storey
FInal for Temp Occupancy, so owner can move in on Saturday, and we can start Phase II on Monday.
Second Floor suite 203 Phone #: ###-#### Inspection requested via web by Michael Schreiberfirst phase ok
BLD-Ceiling Grid Inspection12/22/201612/22/201612/22/2016PPASS
DetailsJim Sly
On second floor, Suite 203 Phone #: ###-#### Inspection requested via web by Michael Schreiber
BLD-Framing/Rough-in11/14/201611/15/201611/15/2016APASS
DetailsJim Storey
On the second floor. Going to one side sheet rock. Phone #: ###-#### Inspection requested via web by Michael Schreiber first phase ok