BLD-Final | 8/7/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Mike Jordan
|
|
|
Matt Phone #: ###-####. Ok for perm occ. No electrical permit was required.
|
FIRE-Final Inspection | 7/26/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 7/3/2017 | 7/5/2017 | 7/5/2017 | P | FAIL |
Troy Cobbley
|
|
|
Still missing two exit signs as marked on the city approved plans.
|
BLD-Framing/Rough-in | 7/3/2017 | 7/3/2017 | 7/3/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Conference | 5/4/2017 | 5/8/2017 | 5/8/2017 | A | DONE |
Mike Jordan
|
|
|
Meeting with Steve from K2 construction at 10:00am.
|
BLD-Framing/Rough-in | 5/8/2017 | 5/8/2017 | 5/8/2017 | A | PASS |
Mike Jordan
|
|
|
Meeting with Steve from K2 construction at 10:00am. Column wraps for 1hr. const. ok.
|
BLD-Conference | 4/28/2017 | 5/5/2017 | 5/5/2017 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 5/1/2017 | 5/4/2017 | 5/4/2017 | A | DONE |
Mike Jordan
|
|
|
Went over completed work and what still needs to be addressed. Tenant aslo to schedule a fire/life/safety final to see what outstanding issues need addressed. A meeting with Steve from K2 construction has been set up for Monday May 8th. to go over 1hr. construction for type V-A construction to eliminate fire walls.
|
FIRE-Final Inspection | 5/4/2017 | 5/4/2017 | 5/4/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide new exit signs as per plan, relocate exit signs as discussed to match plans, repair emergency lights, provide correct hardware in game room, provide plan modification addressing actual room use as discussed, provide annual inspection for the fire sprinkler system matt Phone #: ###-####
|
BLD-Conference | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | DONE |
Mike Jordan
|
|
|
A correction notice was issued stating to schedule a building conferance to reveiw work done, work remaining and what tenats schedule is to complete work and obtain a certificate of occupancy.
|
BLD-Conference | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | PEND |
Mike Jordan
|
|
|
Check status/scheduling of project. K2 Construction has done some door infill and added some doors. Per K2 this was there scope of work only. I called and left a message with Gabriel Wilson, owner of ABU games but have not received a call back as of 4:40pm today. Will stop by tomorrow and issue a correction notice if needed.
|
BLD-Framing/Rough-in | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | CANC |
Mike Jordan
|
|
|
Steve Phone #: ###-####
|