Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-03241
StatusFinaled
Name ZELHAM INC
Site Address 1401 S LUSK PL
Project NameResidence Inn by Marriott
Customer Number 
ePlanReviewYes
Description
(RESIDENCE INN BY MARRIOTT – GATEHOUSE ADDITION AND REMODEL) (DRH16-00327) A fire sprinkler system will be installed in conjunction with this permit. The fire sprinkler system is used for story increase and for fire area. Demolition work includes removing an existing porte cochere (about 550 square feet), removing exterior walls, cutting back some existing roof eaves, and removing the roof covering. To expand an existing 4,088 square foot building by about 1,124 square feet to 5,212 square feet. Taking into account the demolished porte cochere, the net increase of building area is about 574 square feet. The remodeled area of the expanded building has a floor area of about 3,542 square feet. Work related to the addition includes concrete footings and foundations, concrete slabs on grade, a sunken floor area infill with gravel and a new concrete slab on top, two exterior trellises, exterior walls, exterior shear walls, exterior windows, exterior siding, cultured stone exterior wall finish, new roof structures, new beams and columns, new roof coverings, two existing restrooms upgraded to be accessible to the disabled, a warming kitchen, a direct vent gas fireplace, a dining area, millwork, and finishes. Cooking operations that create grease laded vapors are not allowed. Site work includes reconfiguring the existing swimming pool enclosure fence and gates, reconfiguring the accessible parking spaces and the curb ramps and sidewalks that serve them, creating a passenger loading zone, providing an accessible route from the public way to the main entrance, constructing a new trash enclosure, and removing an existing outdoor concrete spa and fence and providing new landscaping. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. A separate fire sprinkler permit and a separate fire alarm permit shall be obtained prior to beginning any modification or installation work on such system. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/13/20177/13/20177/13/2017PPASS
DetailsDave Hannah
Bruce Phone #: ###-####
BLD-Final6/1/20176/2/20176/2/2017APART
DetailsDave Hannah
Bruce Phone #: ###-#### ok for temp occ needs to fix landings out back door
FIRE-Final Inspection5/31/20176/1/20176/1/2017APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete (fire alarm permit, FIR17-00143, is not attached in project related cases), fire extinguishers are in place with current inspection tags, thumbturn locks on south entrance doors will be changed to double-key deadbolts before final BLD inspection. Final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection5/16/20175/17/20175/18/2017APEND
DetailsDave Hannah
Bruce Phone #: ###-#### ok after elec rough in passes
BLD-Energy code compliance4/12/20174/13/20174/13/2017PPASS
DetailsMike Jordan
Insulation // Bruce Phone #: ###-####
BLD-Framing/Rough-in4/7/20174/10/20174/10/2017APASS
DetailsDave Hannah
Bruce-fire blocking on 1st floor Phone #: ###-####
BLD-Framing/Rough-in4/5/20174/7/20174/7/2017APASS
DetailsDave Hannah
Bruce Phone #: ###-#### ok to insulate
BLD-Wall Bracing2/14/20172/15/20172/16/2017APART
DetailsDave Hannah
Bruce Phone #: ###-#### ok to cover ext but needs to add foundation bolts and washers
BLD-Foundation12/29/201612/30/201612/30/2016APASS
DetailsPhil Shearer
tint foundation.. pour at 11 // Bruce Phone #: ###-####. Forms are tented and heated.
BLD-Foundation12/28/201612/29/201612/29/2016APASS
DetailsDave Hannah
lonnie Phone #: ###-#### crew has tent up and ready for heaters
BLD-Footing12/22/201612/22/201612/22/2016PPASS
DetailsDave Hannah
late morning if possible pour at 2 // Shawn Phone #: ###-####
BLD-Footing12/20/201612/22/201612/22/2016ANR
DetailsDave Hannah
late morning if possible pour at 2 // Shawn Phone #: ###-####