Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-03317
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 5796 E MILLET DR
Project NameMair Residence
Customer Number 
ePlanReviewYes
Description
WUI Zone A, Class A roof required** Permit for the construction of a new 2966 sq. ft., two story (first story 1786 sq. ft., second story 1180 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 473 sq. ft. of covered patio/porch and a 1885 sq. ft. attached garage per the approved plans, and any notations. R-1C zoning and setbacks per planning. **DAF** This structure is required to be fire sprinlered in accordance with NFPA 13D; per Fire Department conditions (CFH16-00047). A separate fire sprinkler permit will be required. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/201712/1/201711/30/2017APASS
DetailsBrandon Shaw
Dining room/patio sliding door and Master bedroom slider, at final, permanent locks (tools required) had been installed.
Rear patio/deck to be permited and installed at a later time
DOC - Permit Finaled11/30/201711/30/201711/30/2017PPASS
DetailsBrandon Shaw
BLD-Final11/21/201711/21/201711/21/2017PNR
DetailsBrandon Shaw
James Phone #: ###-####
BLD-Energy code compliance7/27/20177/28/20177/28/2017PPASS
DetailsBrandon Shaw
James Phone #: ###-####
BLD-Framing/Rough-in7/25/20177/26/20177/26/2017APART
DetailsBrandon Shaw
See corection notice
Need revised Engineering for missing beams
BLD-Energy code compliance7/25/20177/25/20177/25/2017PNR
DetailsBrandon Shaw
Need framing rough-in prior to energy code.
BLD-Wall Bracing7/24/20177/24/20177/24/2017PPART
DetailsBrandon Shaw
Blocking for garage wall done
Nail header and hold down at North( main entry steps) wall
BLD-Wall Bracing7/21/20177/21/20177/21/2017PFAIL
DetailsBrandon Shaw
See correction notice and red crayon
BLD-Conference1/6/20171/9/20171/9/2017APASS
DetailsPhil Shearer
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Foundation1/9/20171/9/20171/9/2017PPASS
DetailsPhil Shearer
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Foundation12/29/201612/30/201612/30/2016AFAIL
DetailsPhil Shearer
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro. Only 9 degrees no heat.
BLD-Footing12/15/201612/16/201612/16/2016APART
DetailsPhil Shearer
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro.
FIRE-Conference11/23/201611/23/201611/23/2016PDONE
DetailsKatie Marron
Discussion with homeowner: revised driveway meets grade requiremet for FD Access per Assistant Fire Marshall. No sprinkleres are required.