Information based on query as of Thursday, June 20, 2024.
Permit Information
Permit NumberBLD16-03413
StatusFinaled
Name TAHOE HOMES LLC
Site Address 3954 E PARKCENTER BLVD
Project Name 
Customer NumberBLD16-03414-BLD16-03416
ePlanReviewNo
Description
WUI Valley, Interior Lot, Class "A" roof required. Permit for the construction of a new 2,084 sq. ft., two story (first story 1,066 sq. ft., second story 1,018 sq. ft.) Townhouse with three bedrooms, two and a half bathrooms, approximately 66 sq. ft. of covered patio/porch and a 590 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code is proposed.**BJM**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/19/20177/20/20177/20/2017APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
DOC - Permit Finaled7/20/20177/20/20177/20/2017PPASS
DetailsBrandon Shaw
BLD-Conference6/5/20176/5/20176/5/2017APASS
DetailsBrandon Shaw
check drywall shear walls Phone #: ###-#### Inspection requested via web by joey benart
BLD-Energy code compliance5/25/20175/25/20175/25/2017PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
BLD-Framing/Rough-in5/24/20175/24/20175/24/2017PPART
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
Pending- mech rough not approved, pressure test gas lines.
OK to insulate after mech pressure test approved
BLD-Wall Bracing5/2/20175/2/20175/2/2017PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by joey benart
BLD-Foundation2/7/20172/7/20172/7/2017PPASS
DetailsDave Hannah
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing1/30/20171/31/20171/31/2017PPART
DetailsDave Hannah
Call for access Phone #: 2088818697 >> Inspection requested via mobile web by Dallin Ragan set backs ok most of the rebar is in crew will cover for three days