BLD-Final | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
DOC - Permit Finaled | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####8,, need cont handrail,, fire caulking
|
BLD-Energy code compliance | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | PASS |
Dave Hannah
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PART |
Tony Young
|
|
|
Ron-party wall Phone #: ###-####,, c/n posted,, ok to insulate,, need fireplaces
|
BLD-Framing/Rough-in | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | PART |
Tony Young
|
|
|
Ron-party wall Phone #: ###-####,, party wall framing ok to cover between floors,, ok to insulate ,, need f/place permit and inspection..
|
BLD-Conference | 2/7/2017 | 2/9/2017 | 2/9/2017 | A | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, pending design for seperation
|
BLD-Framing/Rough-in | 2/6/2017 | 2/7/2017 | 2/7/2017 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, no plans,, conf walk through only,, firewall issue also
|
BLD-Framing/Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | NR |
Tony Young
|
|
|
james Phone #: ###-####,, frame ?s
|
BLD-Other | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | PART |
Jim Storey
|
|
|
Aaron-party wall Phone #: ###-#### screws in gyp ok 2nd floor assembled on ground.
|
BLD-Framing/Rough-in | 12/27/2016 | 12/27/2016 | 12/28/2016 | P | PART |
Jim Sly
|
|
|
Aaron Phone #: ###-#### 5/8 rock...next to property line at 1hr wall....OK
|
BLD-Framing/Rough-in | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PART |
Dave Hannah
|
|
|
Paul Phone #: ###-#### second half first floor fire wall ok to stand
|
BLD-Framing/Rough-in | 12/12/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Tony Young
|
|
|
Erin Phone #: ###-####,, 1st level party wall (pl) nailing,,, ok to stand,, firewall and drywall shear 1st level ok
|
BLD-Foundation | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####,, ok now
|
BLD-Foundation | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PEND |
Tony Young
|
|
|
Randy Phone #: ###-####,, need soils approval 1st
|
BLD-Footing | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Phil Shearer
|
|
|
Randy Phone #: ###-####
|