(WHITEWATER APARTMENTS – COVERED OUTDOOR POOL KITCHEN AND WATERCRAFT SHOP BUILDING) (DRH16-00313) (4-21-17 PLAN MODIFICATION TO CHANGE THE LOCATION OF THE DOCK AT THE BEACH AND TO MODIFY THE PATH OF TRAVEL TO IT. THE ROUTE ACCESSIBLE TO THE DISABLED WILL BE RELOCATED AND A STAIRWAY WILL BE CONSTRUCTED.) This building does not have a fire sprinkler system. To construct a new 679 square foot covered outdoor pool kitchen and watercraft shop building to serve an existing apartment complex. Demolition work includes removing the pool deck trellises, the kids pool, and some concrete pool deck at the North end of an existing swimming pool enclosure to make way for the new construction. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood framed exterior walls with structural wood sheathing, wood roof trusses with structural wood sheathing, standing seam metal roofing, hardboard board and batten siding, hardboard trim, an overhead exterior door, an exterior side-hinged swinging door, exterior windows, work benches, heavy timber beams and columns, galvanized corrugated metal roofing, rough-sawn horizontal cedar barn siding, and kitchen counters. Special Inspection is required for concrete and soils. The covered outdoor pool kitchen will have a refrigerator, a sink, an ice maker, a gas grill, gas cook-top burners, and counter work areas. The kitchen is required to be accessible to the disabled. Gas fire pits will be installed in other areas of the swimming pool enclosure area. A new 6 foot tall swimming pool enclosure fence with gate will be installed around the expanded pool deck area to maintain the existing swimming pool enclosure around the entire swimming pool deck. A concrete sidewalk accessible to the disabled with a running slope no steeper than 1 unit vertical to 20 units horizontal will be constructed leading from boathouse building to a dock access ramp and dock that will NOT be installed under this permit. A retaining wall will be constructed at one edge of a portion of the sidewalk. The structural design for the retaining wall is a deferred submittal item. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/31/20178/1/20178/1/2017APASS
DetailsDave Hannah
Please call Jody Wise ###-#### for access to pool area 20 minutes before you arrive to inspect. Thanks Phone #: ###-#### Inspection requested via web by Jody Wise
BLD-Final5/24/20175/26/20175/26/2017APART
DetailsJim Storey
Please call Phone #: ###-#### Inspection requested via web by Jody Wise temp ok for padio and storage area/ protection under sink to be instaled for ada/ pending walk way and zoning
FIRE-Final Inspection5/24/20175/25/20175/25/2017APASS
DetailsJim Page
Fial life fire safety inspection passed/complete
BLD-Energy code compliance3/9/20173/10/20173/10/2017APASS
DetailsDave Hannah
Jody Wise ###-#### please give mea call Phone #: ###-#### Inspection requested via web by Jody Wise
BLD-Framing/Rough-in2/24/20172/27/20172/27/2017APASS
DetailsDave Hannah
I''m after a shear wall inspection at the watercraft shed. Thanks. Phone #: ###-#### Inspection requested via web by Jody Wise
BLD-Framing/Rough-in2/20/20172/21/20172/21/2017APART
DetailsJim Sly
Shear wall inspection. I need you to look at a wall before I cover it with another wall at the mail center. Thanks Jody Wise ###-#### Phone #: ###-#### Inspection requested via web by Jody
Wise

West wall Mail center shear nailing....OK.
BLD-Foundation12/13/201612/14/201612/19/2016APASS
DetailsDave Hannah
MTI inspecting rebar and compaction Phone #: ###-#### Inspection requested via web by Jody Wise
BLD-Footing12/7/201612/8/201612/9/2016APEND
DetailsDave Hannah