BLD-Final | 8/11/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Storey
|
|
|
House should be unlocked -- please call if there are any problems or questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 8/9/2017 | 8/11/2017 | 8/11/2017 | P | DEFR |
Jim Storey
|
|
|
House should be unlocked -- please call if there are any problems or questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Final | 8/2/2017 | 8/9/2017 | 8/9/2017 | A | NR |
Jim Storey
|
|
|
Final for C of O. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Conference | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PART |
Jim Storey
|
|
|
Mike Phone #: ###-#### stairs not ready ok to move belongs in no sleep over
|
BLD-Other | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | PASS |
Jim Storey
|
|
|
Need an inspection of the Sheetrock Sheer areas please. Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Framing/Rough-in | 4/25/2017 | 4/25/2017 | 4/26/2017 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle ok to cover but stiar framing is in questen dont know finishes need to be checked at final ?
|
BLD-Energy code compliance | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | FAIL |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 | P | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle c/n posted
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/14/2017 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kim Winkle Inspection cancelled from web by: Kim Winkle
|
BLD-Wall Bracing | 3/29/2017 | 3/30/2017 | 3/30/2017 | A | DONE |
Mike Jordan
|
|
|
Need a re-inspect sheet inspection please. Phone #: ###-#### Inspection requested via web by Kim Winkle. Per framer, blocking in portal frame oriantation fixed.
|
BLD-Wall Bracing | 3/22/2017 | 3/24/2017 | 3/24/2017 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Footing | 1/24/2017 | 1/25/2017 | 1/25/2017 | A | PART |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Footing will pass if the following items are verified. Heron, concrete contractor says he will supply supplimental heat. Ave daily Temp approx. 20 degrees. Talked to Kim at Syringa. Need to verify that fill at garage front area was compacted and tested.
|
BLD-Footing | 12/13/2016 | 12/13/2016 | 12/13/2016 | A | PART |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron north/west ft and west window wells
|
BLD-Foundation | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Jim Storey
|
|
|
As early as possible Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Dave Hannah
|
|
|
Steve// Ricardo Phone #: ###-####/ ###-####
|
BLD-Conference | 11/16/2016 | 11/17/2016 | 11/17/2016 | P | CANC |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/15/2016 | 11/16/2016 | 11/16/2016 | P | FAIL |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron no basement need aproved basement from planreview
|
BLD-Conference | 11/2/2016 | 11/7/2016 | 11/7/2016 | A | PASS |
Jim Storey
|
|
|
BMP inspection please. Contact Steve Hanson with any questions. thanks, steve Phone #: ###-#### Inspection requested via web by steve hanson
|