BLD-Final | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Tony Young
|
|
|
Homeowners are currently living in the residence so please call me for a time we can meet at the property. Thanks Bryan ###-#### Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
DOC - Permit Finaled | 11/9/2017 | 11/9/2017 | 11/9/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Other | 9/1/2017 | 9/5/2017 | 9/7/2017 | A | PASS |
Dave Hannah
|
|
|
Brian-sheet rock in soffits Phone #: ###-####
|
BLD-Energy code compliance | 8/10/2017 | 8/11/2017 | 8/11/2017 | A | PASS |
Tony Young
|
|
|
Please call Brent with Marv''s at ###-#### with any questions on Insulation. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Framing/Rough-in | 8/8/2017 | 8/8/2017 | 8/9/2017 | P | PART |
Tony Young
|
|
|
Please call James at 208.899.0640 when headed to the project so he can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel
|
BLD-Framing/Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PART |
Tony Young
|
|
|
Please call James at 208.899.0640 when headed to the project so he can meet you there. Thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel,, need point loads, straps, fire blocking, interior shear,, verify tempered glass at final,, ok to insulate
|
BLD-Wall Bracing | 7/5/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Jim Storey
|
|
|
Plans are located in black tube in the garage. Looking for shear and bracing inspection. thanks Phone #: ###-#### Inspection requested via web by Bryan Mogel walls ok/ pool ok pending ele
|
BLD-Foundation | 5/3/2017 | 5/4/2017 | 5/4/2017 | A | PART |
Tony Young
|
|
|
Jack Phone #: ###-####,, work in progress
|
BLD-Foundation | 5/1/2017 | 5/2/2017 | 5/2/2017 | A | PART |
Tony Young
|
|
|
Jack Phone #: ###-####,, work in progress
|
BLD-Foundation | 4/28/2017 | 5/1/2017 | 5/1/2017 | A | PART |
Tony Young
|
|
|
Jack Phone #: ###-####... work in progress.. ok
|
BLD-Foundation | 4/14/2017 | 4/17/2017 | 4/17/2017 | A | PART |
Brandon Shaw
|
|
|
Jack Phone #: ###-#### Ok to pour thru south retaining wall. Call for inspection on addition to toe in south retaining
|
BLD-Foundation | 4/13/2017 | 4/14/2017 | 4/14/2017 | P | NR |
Tony Young
|
|
|
Jack Phone #: ###-####,, too much rain
|
BLD-Foundation | 3/13/2017 | 3/14/2017 | 3/14/2017 | P | PART |
Dave Hannah
|
|
|
Jack Phone #: ###-#### north retainning wall ok to place concrete
|
BLD-Footing | 2/24/2017 | 2/27/2017 | 2/27/2017 | A | PEND |
Mike Jordan
|
|
|
Jack Phone #: ###-####. Needs soils report. Footings inspected by #415.
|
BLD-Footing | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PEND |
Tony Young
|
|
|
Jack Phone #: ###-####
|
BLD-Footing | 2/22/2017 | 2/23/2017 | 2/23/2017 | P | PEND |
Tony Young
|
|
|
Jack Phone #: ###-####,, needs soils approval 1st
|
BLD-Footing | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | PEND |
Tony Young
|
|
|
Jack Phone #: ###-####
|
BLD-Footing | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PEND |
Tony Young
|
|
|
Jack Phone #: ###-####,, need soils report,, received letter from engineer for ok as built on rebar and forms
|
BLD-Foundation | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | NR |
Tony Young
|
|
|
Jack Phone #: ###-####,, needs hillside soils report 1st
|