BLD-Final | 6/7/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brandon Shaw
|
|
|
Inspection requested via web by Ferd Smith
|
DOC - Permit Finaled | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 6/7/2017 | 6/8/2017 | 6/8/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 6/6/2017 | 6/7/2017 | 6/7/2017 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler pemits addressed. Need single action hardware on the north office door, need correct fire extinguishers in warehouse, need signage on the Electrical Room/Fire Alarm Panel door.
|
BLD-Conference | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | DONE |
Mike Jordan
|
|
|
Responded to a complaint from the land owner to the north of the project. Noted pitrun that was on land to the north. Spoke with contractor, they will remove all pitrun and northern parcell.
|
BLD-Framing/Rough-in | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | CANC |
Mike Jordan
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Ferd Smith
|
BLD-Energy code compliance | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PASS |
Mike Jordan
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Ferd Smith
|
BLD-Framing/Rough-in | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | PART |
Mike Jordan
|
|
|
Interior steel stud framed walls and hardlid for office area. Contractor to have architect resubmit deatails for guards on stairs. Owner has deleted the wall and stairs guards are now non code compliant.
|
BLD-Energy code compliance | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Ferd Smith
|
BLD-Energy code compliance | 2/6/2017 | 2/9/2017 | 2/9/2017 | P | PASS |
Mike Jordan
|
|
|
Inspect visqueen and foundation insulation in bay 8 ; 9. Phone #: ###-#### Inspection requested via web by Ferd Smith. rigid insualtion under slab ok.
|
BLD-Energy code compliance | 11/28/2016 | 11/29/2016 | 11/29/2016 | P | PART |
Mike Jordan
|
|
|
Ferd Phone #: ###-####. Rigid insulation aginst stemwall interior side. Ok to backfill. Wiil provide the remainder of rigid insulation horizontally under slab on grade.
|