Description |
**(ALBERTSONS #154)** //Plan Modification #2 - to add two accessible restrooms to the disabled in the rear North West area of the building and relocated drinking fountain. 1-4-2017 JG// - //Plan Modification to remove exterior canopy and add a new exterior trellis on the northwest corner of the existing building. 12-19-2016 JG// Permit to remodel throughout the interior of this existing 44,769 sq. ft. grocery store. Approval is contingent upon adhering to the approved plans on file. Work will include: @ customer service area: removal of select millwork, removal of suspended wall, new walls at cash room and new millwork. @Floral area: remove select interior nonbearing walls, removal of select millwork, removal of suspended wall, new half walls and new millwork. @Deli area: remove select interior nonbearing walls, new millwork and select new suspended wall. @RX area: removal of select interior nonbearing walls, removal of select millwork, new walls to create an RX consult room, new door/door frames, new millwork. @Miscellaneous throughout sales floor areas: removal of plastic double doors leading to rear storage area at dairy/RX and dairy/meat and replaced with new plastic double doors, removal of check stand guard rails, new millwork at beer wine area, new false columns at beer & wine area, at aisle #1 and at aisle #8, relocation or new gondolas/shelving/display cases, relocation or new refrigerated cases, relocation or new equipment, electrical work, plumbing work mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
|