Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-04077
StatusFinaled
Name ESI
Site Address 12142 W JOPLIN RD
Project NameBFD - Administration/Classroom
Customer Number 
ePlanReviewYes
Description
(BOISE FIRE DEPARTMENT – ADMIN/CLASSROOM BUILDING)(***GREEN CONSTRUCTION CODE USED - PRIORITY REVIEW*** ) To meet 2012 International Green Construction Code as adopted. To construct a 5,926 sq. ft. one story commercial business building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, CMU exterior envelope walls, open web steel roof joist, steel roof decking, electrical, mechanical and plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building will be fully Fire Sprinklered with an approved Fire Alarm system. System shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Special Inspections Required see form 310. Note: This building requires a Preoccupancy Commissioning Report, this report shall be submitted and accepted by the Building Official prior to issuance of the Certificate of Occupancy. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/3/20184/4/20184/4/2018APASS
DetailsJim Sly
Perm C of O Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Final4/2/20184/2/20184/3/2018PPART
DetailsJim Sly
Late afternoon if possible Phone #: ###-#### Inspection requested via web by Chris Palmer
OK for Temp. Occ. OK for Perm. Occ. when Plumbing finals.
BLD-Final3/29/20183/29/20183/29/2018PCANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer
BLD-Final3/16/20183/16/20183/16/2018PNR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Chris Palmer
FIRE-Final Inspection3/15/20183/16/20183/16/2018APASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by Chris Palmer
FIRE-Final Inspection3/12/20183/13/20183/13/2018AFAIL
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled, Need city approved plans and small documents. No testing was performed.


Please coordinate with sprinkler and alarm.
Thanks Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Conference3/8/20183/9/20183/9/2018ADONE
DetailsJim Sly
Pre-final/CofO Conference Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Ceiling Grid Inspection1/11/20181/12/20181/12/2018PPASS
DetailsJim Sly
Admin Bldg. Please coordinate with electrical inspection scheduled for pm. Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Energy code compliance11/13/201711/13/201711/13/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Chris Palmer
Interior sound batts
BLD-Energy code compliance11/7/201711/7/201711/7/2017PPASS
DetailsJim Sly
Exterior walls foam insulation in the Admin Bldg. Phone #: ###-#### Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in10/27/201710/30/201710/30/2017APASS
DetailsJim Sly
Dave Phone #: ###-####
BLD-Other6/28/20176/29/20176/29/2017PPART
DetailsJim Sly
insp for reinforcement for slab on grade for admin classroom building // Justin Rueb Phone #: ###-####
OK pending MTI special inspection, tests and approvals.
BLD-Footing6/22/20176/26/20176/26/2017PPART
DetailsMike Jordan
reinforcing for slab on grade // Dave Perkins Phone #: ###-####. Ok, pending special inspection.
BLD-Wall Bracing6/5/20176/6/20176/7/2017PPART
DetailsJim Sly
Dave Phone #: ###-####
Should be Concrete.......MTI on site.