BLD-Framing/Rough-in | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Jim Sly
|
|
|
As soon as possible /// Bill Phone #: ###-####
|
BLD-Wall Bracing | 5/11/2017 | 5/11/2017 | 5/11/2017 | P | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-#### Mono pour footing, wall and slab.....OK.
|
BLD-Footing | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | FAIL |
Jim Sly
|
|
|
Cafco Inc Phone #: ###-#### Footing does not match what is on approved plan. wants to mono pour footing wall and slab Need to know what Boise City requires for this technique. Called Contr.
|