BLD-Final | 11/6/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Brandon Shaw
|
|
|
Please call ahead for access - Noah Phone #: ###-####
|
DOC - Permit Finaled | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Brandon Shaw
|
|
|
|
FIRE-Final Inspection | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
Jim Page
|
|
|
Exit signs are in place, final life fire safety inspection passed/complete.
|
BLD-Final | 11/2/2017 | 11/3/2017 | 11/3/2017 | P | CANC |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
FIRE-Final Inspection | 11/1/2017 | 11/2/2017 | 11/2/2017 | P | FAIL |
Troy Cobbley
|
|
|
Corrections have been made except as per plan review exit signs are required at the gates in the pool area.
Noah Phone #: ###-####
|
FIRE-Final Inspection | 10/25/2017 | 10/26/2017 | 10/26/2017 | P | FAIL |
Troy Cobbley
|
|
|
I referred the contractor back to the plan reviewer due to questions on the review. Itmes include number of gates requiring panic hardware, door mags being used on the west side gate and possible exit signs or emergency lights in the pool area. Contractor did not have the small documents. Thumbturn dead bolts have been used on the Locker rooms where plans call for lever action. The canopy emergency lights did not work.
Please call ahead for access - Noah Phone #: ###-####
|
FIRE-Final Inspection | 10/23/2017 | 10/25/2017 | 10/25/2017 | P | CANC |
Jim Page
|
|
|
Inspection request cancelled per conversation with point of contact, Noah Phone #: ###-####. Inspection will be rescheduled for a later date.
|
BLD-Conference | 10/24/2017 | 10/24/2017 | 10/24/2017 | P | DONE |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Foundation | 9/7/2017 | 9/8/2017 | 9/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Energy code compliance | 8/10/2017 | 8/14/2017 | 8/14/2017 | A | PASS |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Wall Bracing | 6/23/2017 | 6/26/2017 | 6/26/2017 | A | PASS |
Brandon Shaw
|
|
|
|
BLD-Wall Bracing | 6/21/2017 | 6/23/2017 | 6/23/2017 | A | CANC |
Brandon Shaw
|
|
|
Noah Phone #: ###-####
|
BLD-Energy code compliance | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | PART |
Brandon Shaw
|
|
|
Noah Slap insulation
|
BLD-Foundation | 4/25/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Brandon Shaw
|
|
|
Brent Phone #: ###-####
|
BLD-Footing | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Brandon Shaw
|
|
|
Nathan Phone #: ###-####
|
BLD-Footing | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | CANC |
Brandon Shaw
|
|
|
Late morning, around 11-12 - Nathan ###-####
|