BLD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Final | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Temp occ. Will be for perm occ. once zoning signs perm.
|
BLD-Final | 2/5/2018 | 2/6/2018 | 2/6/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Conference | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Final | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PART |
Mike Jordan
|
|
|
Please accommodate a 10:30 inspection. Fire final is scheduled for 10 o''clock. Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Needs to provide 5/8 type x rock at HVac ductwork in garage and repair 1 hr. walls.
|
FIRE-Final Inspection | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 1/31/2018 | 2/1/2018 | 2/1/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need smoke alarms to be located atleast 3' from fan blades and re-tested, need fees paid and inspection called in for the project related fire alarm permit. Need paint removed from the FDC.
|
BLD-Final | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Needs plumbing, life safety and fire finals
|
BLD-Framing/Rough-in | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 11/22/2017 | 11/22/2017 | 11/22/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 11/15/2017 | 11/16/2017 | 11/16/2017 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by david scaggs. Repair all holes, f complete fire caulking and complete install of sheetrock on fire partition in attics. Provide fix from joist manufacturer for all cut top chords on floor joist and repair. Install bracing on top chords of trusses at over builds were roof sheathing has been left off.
|
BLD-Framing/Rough-in | 11/9/2017 | 11/13/2017 | 11/12/2017 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by david scaggs Inspection cancelled from web by: david scaggs
|
BLD-Wall Bracing | 9/20/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Mike Jordan
|
|
|
Exterior Shear Inspection requested via web by Marty Short
|
BLD-Concrete | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Mike Jordan
|
|
|
Garage int footings Inspection requested via web by Marty Short
|
BLD-Concrete | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PASS |
Mike Jordan
|
|
|
Int footings. Concrete is scheduled for 8am Inspection requested via web by Marty Short
|
BLD-Energy code compliance | 7/10/2017 | 7/11/2017 | 7/11/2017 | A | PASS |
Mike Jordan
|
|
|
Rigid insulation Inspection requested via web by Marty Short
|