FIRE-Final Inspection | 7/5/2018 | 7/5/2018 | 7/5/2018 | A | PASS |
Jim Page
|
|
|
Fire alarm permit has been finaled, final life fire safety nispection complete.
|
FIRE-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | FAIL |
Jim Page
|
|
|
Fire alarm permit FIR17-00230 needs to be inspected and finaled before life fire safety inspection can be completed.
call him if have any questions // Brandon Phone #: ###-####
|
BLD-Final | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | NR |
Jim Sly
|
|
|
Brandon Phone #: ###-#### Called Brandon and gave him a list........Need final letter of approval from MTI special inspections, Finals from Ele 17-01549 Fir 17- 00230 (alarm). Fire Life Safety, PWK 17-00071, 00008 and 00019 and Zoning. Then call for structural final.
|
BLD-Aging Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 12/15/2017 | 12/15/2017 | 12/18/2017 | P | PART |
Dave Hannah
|
|
|
Partial for occupancy Phone #: ###-#### Inspection requested via web by Brandon Reynolds hand rail front steps ok to use
|
BLD-Conference | 10/25/2017 | 10/26/2017 | 10/26/2017 | A | DONE |
Dave Hannah
|
|
|
Would like to discuss handrails on ped ramp at Idaho St. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Final | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PART |
Dave Hannah
|
|
|
This is for approval to allow pedestrian access to the Capitol St. doors on Wednesday the 25th. Phone #: ###-#### Inspection requested via web by Brandon Reynolds ok to use front doors
|
BLD-Final | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | NR |
Dave Hannah
|
|
|
This is for approval to allow pedestrian access to the Capitol St. doors on Wednesday the 25th. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Ceiling Grid Inspection | 10/16/2017 | 10/17/2017 | 10/18/2017 | P | PASS |
Dave Hannah
|
|
|
Ceiling grid inspection, Electrical inspection in a.m. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Framing/Rough-in | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PASS |
Dave Hannah
|
|
|
Wall and header framing in vestibule capitol st. entrance. Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Foundation | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PEND |
Dave Hannah
|
|
|
Brandon-rebar Phone #: ###-#### ok after spec insp sign off
|