Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD16-04414
StatusIssued
Name FALASH & COMPANY INC
Site Address 250 E PARKCENTER BLVD
Project NameAlbertsons GO - Phase 9 TI
Customer Number 
ePlanReviewYes
Description
(ALBERTSON'S GENERAL OFFICE - 2nd FLOOR PHASE 9) This building is fully fire sprinklered for area increase and has 60 foot yards on all sides for unlimited area. Permit to remodel an existing office space on the S/W section of the 2nd floor. Approval is contingent upon adhering to the approved plans on file. Scope of work to include: construction of select interior nonbearing walls to create (1) office, new door/door frame, electrical work, mechanical work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered for unlimited area building provisions Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/13/20172/14/20172/14/2017APASS
DetailsJim Storey
greg Phone #: ###-####
FIRE-Final Inspection2/13/20172/13/20172/13/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete
FIRE-Final Inspection1/23/20171/23/20171/23/2017PFAIL
DetailsTroy Cobbley
Not ready for life safety until the door/hardware has been installed
FIRE-Final Inspection1/18/20171/19/20171/19/2017ACANC
DetailsTroy Cobbley
To be canceled per general contractor. To be rescheduled. Greg Phone #: ###-####
BLD-Framing/Rough-in12/15/201612/16/201612/16/2016APASS
DetailsJim Storey
Greg Phone #: ###-####