BLD-Final | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Brandon Shaw
|
|
|
call for access (jayo)- Cameron Phone #: ###-####
|
DOC - Permit Finaled | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 7/5/2017 | 7/6/2017 | 7/6/2017 | A | PASS |
Jim Storey
|
|
|
cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PART |
Jim Storey
|
|
|
cameron Phone #: ###-#### c/n posted
|
BLD-Wall Bracing | 5/22/2017 | 5/23/2017 | 5/23/2017 | A | PART |
Jim Storey
|
|
|
Cameron Phone #: ###-#### exterior ok / soffit front and back requir fire septration to be finsked and verrafied.
|
BLD-Energy code compliance | 4/26/2017 | 4/27/2017 | 4/27/2017 | A | PASS |
Jim Storey
|
|
|
Cameron Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Jim Storey
|
|
|
Cameron Phone #: ###-#### gyp ok insulation ok
|
BLD-Energy code compliance | 3/31/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-#### p/l wall ft to 3ft above floor ok 2hr
|