BLD-Aging Inspection | 10/5/2017 | 10/5/2017 | 10/5/2017 | | PASS |
Mike Jordan
|
|
|
Needs to pick up C.O.
|
BLD-Final | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 5/18/2017 | 5/19/2017 | 5/19/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 5/17/2017 | 5/17/2017 | 5/18/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide annual inspection for the existing fire extinguishers and add one in the back corridor. Provide testing for all of the exit signs and emergency lights.
|
BLD-Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | NR |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Needs fire/life/safety.
|
BLD-Final | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | NR |
Jim Storey
|
|
|
Tom Phone #: ###-#### mech permit and final insp.
|
BLD-Framing/Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Mike Jordan
|
|
|
Tom would like late AM if possible Phone #: ###-####. Interior steel stud framed walls ok phase 2 no grid. Soffit framing ok, pending fire sprinkler rough in inspection.
|
BLD-Framing/Rough-in | 3/8/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####-please do inspection late pm so the ele inspector can do his inspection early am. Phase 1, interior steel stud framed walls for offices, breakroom.
|